\References • Aamodt, A., and Plaza, E. (1994),’’Case-Based Reasoning; Foundational Issues, Methodological Variations and System Approaches”, A1 Com - Artificial Intelligence Communications 7(1). • Ackoff, R.I., and Sasieni, M.(1968), “Competitive problems of operations research”, Wiley, New York. • Aggraval, S., Jain, S.S., and Parida, M. (2003), “ New Techniques and Technologies for Pavement Management Systems”, New building Materials & Construction world Sept 2003 • Ahmed, I., and Minkarah, I.A.(1988), “Questionnaire survey on bidding in construction,” ASCE Journal of Management in Engineering divisions, 4 (3), July. • Ahmed, I. (1990), “Decision- support system for modeling bid/no-bid decision problem.” V. Constr. Engrg. And Mgmt., ASCE,. • Akintoye, A., and Skitmore, M. (1991), “Profitability of UK construction contractor”. Construction Management and Economics. • Azzaro, D., Hubbard, J., and Robertson, D.(1987), “Contractors’ Estimating Procedures -An Overview”, Royal Instruction of Chartered Surveyors, London. • BCA (2001) Building and Construction Authority, http:// www.bca.gov.sg/. • Bell, L.B. (1969), “A system for competitive bidding”, Journal of Systems Management, March 1970. • Benjamin, N B H (1972). “Competitive bidding : The probability of winning.” J. constr. Div., ASCE, 98(9), 313-330. • Bernard, J., and Washio, T.(1989), “Expert Systems in the Nuclear power Reactors”, ANS publishing, La Grange park. • Broemser, G.M.(1968), “Competitive bidding in the construction industry.” Dissertation presented to Stanford University/, in partial Fulfillment of the Degree of Doctor of philosophy. . Brown, D.C., Melanie, J., Michael J., and Reuben, D. (2001). “ New project Procurement process” Journal of Management in Engineering Vol 17 . Chua, D.K.H., and Li, D. (2000), “Key Factors in bid reasoning Model:” 'J. Constr. Engrg. And Mgmt., ASCE sept 2000. . Chua, D.K.H., Li, D„ and Chan, W.T. (2001), “Case Based Reasoning approach in Bid decision making:” ‘J. Constr. Engrg. And Mgmt., ASCE Jan 2001. and Maines, P.W. (1973), “Closed competitive bidding”, Omega,. 1(5) • Curtis, F.J • Dozzi, S.P., Abdu Rizk, S.M., and Schroeder, S.L. (1996), “Utility- theory model bid mark decisions” Journal of Construction Engineering and Management ASCE, 122 • Drew, D.S.,and Skitmore, R.M.(1997), “The effect of Contract type and size competitiveness in bidding” Construction Management and Economics, 15,469-89. • Dulaimi, M.F., and Guoshan, H.(2002), “ The Factors influencing bid mark-up decisions of large and Medium size contractors in Singapore” construction management & Economics Vol 20 • Fayek, A. (1998). “ Competitive bidding strategy model and Software system for bid preparation” Journal of construction Engineering and Management Vol 124 • Fayek, A. (1996a), “A Competitive estimating and tendering strategy model for use in the civil engineering construction industry.” PhD thesis, dept.of Civ. And Envir.Engrg., univ.of Melbourne, Melbourne, Victoria Australia. • Feigenbaum, E.P., McCordck, P., and Ni, H.P.(1988), “The Rise of the Expert company”, times books, New York,. • Ferguson, N.S., Langford, D.A., and Chan,W.M.(1995), “Empirical study of tendering practice of Dutch municipalities for the procurement of civil- engineering contracts.” Int. J. proj. Mgmt., Oxford, England, 13(3), • Friedman, L. (1956), “A competitive bidding strategy” Operation research A , June. • Gates, M. (1967), “Bidding Strategies and probabilities”, ASCE Journal of the construction divisions, (C01), March. • Hegazy, T., and Moselhi, O. (1995), “Elements of cost estimation: A survey in Canada and the United states.” Cost Engrg. • Isoft ,S.A. (1996), “Recall : case based reasoning package user’s reference guide”, Chemin de Moulon, France. • Jaselskis, E.J.,and Talukhaba, A. ( 1998), “Bidding considerations in developing countries”/. Constr. Engrg. And Mgmt., ASCE June 1998 . Kaplan, S., Frank, M.S., Bley, D. C„ and Lindsay, D.G. (1987), “Outline of COPILOT, Expert System for Reactor Operational assistance Using a Bayesian Diagnostic module”, Proceeding of the International post SMiRT- 9 Seminar accident sequence modeling: Human actions. System Response Intelligent Decision Support, Munich, . King, M„ and Mercer, A. (1990), “Optimum makeup when bidding uncertain costs”, European Journal of operational Research. 47 (3), August 15. . Kosko, B (1992), “Neural Networks and fuzzy systems”, Prentice-Hall. Englewood Cliffs, NJ. on Journal of on 1• Kolonder, J.L.( 1993),’’Case-based Reasoning”, Morgan Kaufman publishers Inc. San matea, Calif • Lifson, M.W., and Shaifer, E.F.(1982), “Decision and Risk Analysis for construction Management”, Wiley ,New York. • Lee, C.C. (1990),’’Fuzzy Logic in Control Systems”, IEEE Transactions on Systems, Vol 20. • McCaffer, R. (1976), “Contractors’ bidding behaviour and tender price prediction”, Ph.D. thesis, Loughborough University of technology. • Moselhi, 0., Hegazy, T., and Fazio, P. (1993), “DBID: Analogy-based DSS for bidding in construction”, J. Constr. Engrg. AndMgmt., ASCE,.l 19(3) • Neufville, R., and King, D. (1991), “Risk and need-for-work premiums in contractor bidding”, J. Constr. Engrg. And Mgmt., ASCE,.l 17(4) • Oberlender, G.D., and Trost, S.M.(2001),” Predicting accuracy of early cost estimates based on Estimating quality” / Constr. Engrg. And Mgmt., ASCE June 2001. • Odusote,0.0., and Fellows, R.F. (1992),”An examination of the importance of resource considerations when contractors make project selection decisions.” Constr.Mgmt. and Economics. • Ousterhout, J.K.(1994),” Tel and TK toolkit”, Addison - Wesley, Reading. Mass. • Park, W.R., and Chapin Jr., W. B.(1992), “ Constructions Bidding: Strategic pricing for Profit”, 2nd Edn. Wiley, New York. • Pais, C.P., and Sugeno, M.( 1985),’’Fuzzy relational equations and the inverse problem”, Fuzzy sets and Systems. • Perera, A.A.D.A.J., Imriyas, K(2003),“Fuzzy KBS for Cost and time Control” “Constr.Mgmt. and Economics ,22 (2). • Rick, and Knight (1991), - URL • Ricker, M., (1986),“An Evaluation of Expert System Development Tools” Expert Systems, Vol.3,1986. • Riesbeck, C.K., and Shank, R.C.( 1989),’’Inside Case-Based Reasoning” Lawrence Assoc., Hillside, N.J. • Saaty, T.L.(1977),”A Scaling method for priorities in hierarchical structures”, J. Math. Psychology, 15(1). • Sanders, S.R., and Cooper, T.(1990),“ Factors affecting contractor profitability.” Trans.. Am.Assoc. of cost Engrs.. American Association of Cost Engineers, American association of Cost Engineers,Morgantown, • Shash A. (1993), “Factors considered in tendering decisions by top UK contractors. Constr. Mgmt. and Economics. 11 I• Shash, A., and Abdul-hadi, N. H. (1992), “Factors affecting a contractor’s mark-up size decision in Saudi Arabia.” Constr. Mgmt. and Economics. 10 • Swarout, W., and Smoliar, S.(1987), “On Marking Expert Systems More Like Expert Systems”, Vol.4, No.3 • Ting, S.C., and Mills, A. (1996), “Analysis of contractors’ bidding decisions.” Proc., CIB W92 Int. symp.on procurement sys., Univ. of Natal, Durban, South Africa. • Tsoukalas, L.H., and Uhring, R.E.,(1992) “Fuzzy & Neural Approaches in Engineering “ Wiley interscience publication ISBN 0-471- 160003-2 USA. • Van Horn, M.( 1986),“Understanding Expert Systems“, Bantan Books NY IFAC Oxford • Wanous, A.H., Boussabaine, and Lewis, J.(2000), “To bid or Not to Bid: A parametric Solution” Jr Construction Management and Economics 2000(18,) • Wateman, D.(1986), “How Do Expert system differ from Conventional Programs” Expert Systems Vol.3,No.l, • Willenbrock, J.H.(1973), “Utility function determination for bidding models.” J. Constr. Div., ASCE 99(1) • Zadeh, L.A. (1965), “Fuzzy sets”, Information and control Vol (8) • www.mathworks.com -(Fuzzy logic Tool Box -Users manual)