U b j D O ' J l & M DEVELOPMENT OF HIGH PERFORMANCE AUTOMATIC VOLTAGE STABLIZER FOR TELECOMMUNICATION APPLICATIONS A dissertation submitted to the Department of Electrical Engineering, University of Moratuwa in partial fulfillment of the requirements for the Degree of Master of Science by: SHYAM SANDARUWAN KAWSHALYA THOTAGAMUWAGE L IBRARY UNIVERSITY CF MORATUWA, SRI LANKA feiGHATU'.VA Supervised by: DR J.P. KARUNADASA University of Moratuwa 9 2 9 7 1 , vN r ' X >1 bJI. 3 o<5 Department of Electrical Engineering, University of Moratuwa, Sri Lanka. December 2008 / c ^ 9 2 9 7 1 DECLARATION I certify that the work submitted in this dissertation is the result of my own investigation, except where otherwise stated. It has not already been accepted for any degree, and is also not being concurrently submitted for any other degree. S.: w ge 22-12-2008 I endorse the declaration by the candidate. DR J.P. Karunadasa Supervisor ABSTRACT The Telecommunication industry in Sri Lanka is having very fast growing and expanding services to their customers. Also, the increasing number of telecom service providers has entered to the industry during past decades, with much competitive Tariffs. At the same time, a regulatory body called "Telecommunications Regulatory Commission of Sri Lanka" (TRCSL) was legally formed under the Sri Lanka Telecommunication (Amendment) Act No. 27 of 1996 and start benefiting to the nation in terms of quality, choice and value for money by extending the optimum conditions of the telecommunications industry in Sri Lanka. The main challenge of the service provider is to sustain with the competitive Tariff reductions and advancement of their services to customer door step demanding by the industry. Not like in other industry, the telecom customer is having the freedom to select any service provider by own decision without facing any monopoly or other influence by the industry. This automatically creates the industry to reduce their OPEX & CAPEX continually. The CAPEX is always increasing and the reduction possibility exists only with OPEX in the telecom industry. Electricity is contributes to the major portion of OPEX of remote telecom site operations. The electricity by means of Diesel Generator (DG) operation or Commercial supply (CEB/ LECO) is always a difficult facility in remotely operated telecommunication base stations. This is due to the nature of the location of the selected site and the quality of the nearest/ rural commercial supply. Due to this, the site needs to run with the DG in most of the time period of the day or face with service outages due to interruptions of the electricity with huge OPEX and unexpected losses in income. The main objective of this research project is to develop a system for automatic voltage regulation at remote telecommunication sites with customized features. The unit is expected to operate under extreme climate, ii environmental & power abnormality conditions to regulate & maintain reliable & accurate sinusoidal voltage profile to the sensitive telecommunication equipments. In addition, the development of the unit should capable to meet the protection requirements from various environmental & power abnormalities, modular construction for easy customization at initial site installations & maintenance, Increased system efficiency, output power quality, fast voltage correction, long life of operation, noise free regulation, less maintenance attention, automatic monitoring, controlling & operation, relatively small construction with lightweight package at lowest possible cost will also be some of the expected outcomes of this development. This research paper will present the background review, detail technical analysis, theoretical development & design, financial analysis and possible areas of further improvements. At the same time, sample implementation also carried out in several sites of Lanka Bell Ltd was proved a considerable financial benefit back to the company. The outcomes of this research will be a remarkable development in the telecom industry. We also supposed to share this knowledge with all the interesting parties to extend the benefits not only to the telecom service providers, but also to the customers by means of lowest tariffs. CONTENT Declaration * i Abstract ii Acknowledgement vii List of Figures viii List of Tables ix 1. Introduction 1 1.1 Objectives of the development 1 1.2 Proposed Features 1 1.3 Why the power quality is important 2 1.3.1 Voltage sags 3 1.3.2 Brownouts ...... 3 1.3.3 Over voltage & Surges 3 1.3.4 High voltage spikes 4 1.3.5 Electrical noise 4 1.3.6 Blackouts & Mains failure 4 1.3.7 Summary of the Solutions 5 1.4 Research Area 6 1.5 Expected Outcomes . 6 2. Background review & Motivation 8 2.1 Power to the telecom sites 8 2.2 Standard Equipments in BTS 8 2.3 Standby Diesel Generator operation due to low voltage 9 2.4 Dedicated Transformers for distance sites 10 2.5 General applications of Voltage stabilizing systems 11 2.6 Effects of supply voltage variations in equipment operation 11 3. Results of Sample survey 14 3.1 Introduction on the sample site & test equipments 14 3.2 Sample Graphs of Voltage & Current distortions 15 3.3 Suggestions for Voltage correction 18 4. Development Areas & Techniques 4.1 Proposed Developments 20 20 iv 4.2 Proposed 30 Features - Summery of the Techniques 22 5. Theoretical Development 26 5.1 Development Areas 26 5.2 Problem Identification and Categorization 27 5.3 Analyze the problem, Solutions & related issues 28 5.4 Technical approach for the proposed solutions 33 5.4.1 Define the RBS Models ....... 33 5.4.2 Identify the Design Requirements for each Model 35 5.4.3 Theoretical methodology of the design 37 5.4.4 Various design techniques used in voltage stabilizers 37 5.4.4.1 Electronic Servo / Electro - Mechanical Design 37 5.4.4.2 Solid State Saturable Reactor Design 39 5.4.4.3 Magnetic Induction Solid State Design 40 5.4.4.4 Ferro-Resonant Super Isolation Solid State Design 41 5.4.4.5 Electronic Tap Changing Solid State Design 42 5.5 Design of the Servo Motor system 43 5.5.1 Aim of the design 43 5.5.2 General Design Procedure 43 5.5.3 Constructional & Operational characteristics 44 5.5.4 Specifications & Design parameters 46 5.5.5 Selection of Materials 46 5.6 Design of Autotransformer in the stabilizer 47 5.7 Design of control system in the stabilizer 49 5.8 Achieving the highest accuracy of the output Voltage 52 5.9 Incorporate protections for the system 55 5.9.1 Short-circuit and overload protection 55 5.9.2 Over and Under Voltage protection 55 5.9.3 Safe Start, Bypass and Circuit Breaker protection 55 5.9.4 Lightning & Surge Protection 56 5.9.5 Auto/Manual Control & Emergency by-pass 56 5.9.6 Line / Output Reactor 56 5.9.7 RFI / EMI Filters 57 5.9.8 Sine Wave Motor Protection Filters 57 5.10 Maintenance & Monitoring facilities 58 5.11 Energy Efficiency, loss reduction & power savings 59 5.11.1 Energy-Efficiency in Motors 60 5.11.2 Determine Cost Effectiveness of the Motors 61 5.11.3 Energy optimization of equipments in operation 62 • 5.12 Technical Analysis on the Power Quality of LV network 64 5.12.1 Introduction on Power Quality 64 5.12.2 Mathematical modeling of Load level voltage fluctuation 64 5.12.3 Power Quality disturbances 67 5.12.4 Voltage fluctuations . 68 5.12.5 Managing PQ Problems 72 5.12.6 Power Quality Standards 73 6 Results and Analysis 75 6.1 Overview of Outcomes 75 6.1.1 Direct Financial Benefits 75 6.1.2 Operational Overhead Reductions 76 6.1.3 Technical Benefits 76 6.2 Reduction of the Network Outage Time . 77 6.3 Reduction of the Customer Complains 79 6.4 Reduction of the Operational Overhead 81 7 Financial Feasibility Analysis 84 7.1 Overview ..... 84 7.2 Cost Calculation for Generator Operation 85 7.2.1 Generator as Back up Power Source 85 7.2.2 Generator as Main Power Source 87 7.2.3 Summary of DG cost vs. running hours 89 7.3 Analysis of Traffic on standard RBS site 89 7.4 Analysis of Tariff applicable for customers . 90 7.4.1 Tariff Charges on post paid customers 91 7.4.2 Tariff Charges on Pre paid customers 91 7.4.3 Tariff Charges on IDD customers 92 7.4.4 Summary of Revenue on call charges for 24hrs 92 7.5 Revenue saving per day on each RBS Model 93 8 Conclusion 96 References 97 Appendix . . . 99 vi ACKNOWLEDGEMENT I would like to thanks my supervisor, Dr J.P. Karunadasa, Head of Electrical Engineering department, for his right direction, great insights, perspectives, guidance and sense of humor. My sincere thanks go to the former Head of Electrical Engineering department Professor H.Y.R. Perera, course coordinator, Dr. Lanka Udawatta and all the academic staff who helped in various ways to clarify the things related to my academic works in time with excellent cooperation and guidance. Sincere gratitude is also extended to the people who serve in the Department of Electrical Engineering. I also thanks to Mr. Krishan Gamage, General Manager, Technical Operations, Lanka Bell Limited for arranging the required funding for the research implementations, Mr. Kusal Saranath, Divisional Manager, Technical Operations, who gave special guidance on clarifying technical matters and, Anura Liyanage (Engineer, Maintenance) for his time on helping me to conduct the preliminary technical surveys and gathering technical literatures in many of the sites in various places in Sri Lanka. I also like to thank my wife, Inoka for her time & kind effort to re-check the draft copy of the Thesis to make this a perfect presentation. Lastly, I should thanks many individuals & friends who have not been mentioned here personally in making this educational process a success. May be I could not have made it without your supports. S.S.K. Thotagamuwage vii LIST OF FIGURES Fig 2.1: Equipment block diagram of standard RBS room. Fig 3.1: Test arrangement of Equipment at Kuruwita Lanka Bell RBS site Fig 3.2: Proposed rearrangement of equipments inside the Kuruwita Lanka Bell site Fig 5.1: Proposed arrangement of equipments inside the RBS site Fig 5.2: Schematic arrangement of Model 1. Fig 5.3: Schematic arrangement of Model 2(a). Fig 5.4: Schematic arrangement of Model 2(b). Fig 5.5: Schematic arrangement of Model 3. Fig 5.6: Circuit arrangement of Electronic Servo / Electro - Mechanical Design Fig 5.7: Circuit arrangement of Solid State Saturable Reactor Design Fig 5.8: Circuit arrangement of Magnetic Induction Solid State Design Fig 5.9: Circuit arrangement of Ferro-Resonant - Super Isolation Solid State Design Fig 5.10: Circuit arrangement of Electronic Tap Changing Solid State Design Fig 5.11: Schematic diagram of Servo motor system Fig 5.12: Standard assemblies of Servo motor Fig 5.13: Block diagram of a servo system controls Fig 5.14: Standard control circuit of Automatic voltage stabilizer Fig 5.15: The growing gap of the Peak oil discovery and the world consumption Fig 5.16: Simple model of power system Fig 5.17: Phase diagram of supply voltage Fig 5.18: Characteristics of voltage fluctuations Fig 6.1: Graphical representation of network outages in last 4 months Fig 6.2: Graphical representation of Customer Complain in last 4 months Fig 6.3: Graphical representation of main actual OPEX in last 4 months Fig 7.1: Traffic curve (in Erlang) of Badalkumbura RBS site for one week period Fig 7.2: Traffic curve (in Erlang) of Hatharaliyadda RBS site for one week period VIII LIST OF TABLES Table 1.1: Performance of some the main present power solutions Table 2.1: Generator Diesel & Potter Cost at Under Voltage sites Table 2.2: Cost of Transformer installation at CEB unavailable sites (Lanka Bell Ltd) Table 2.3: Effect of voltage variations on equipment operations Table 3.1: Technical specifications of the AVS tested at the Kuruwita Lanka Bell site. Table 4.1: Summery of the Proposed 30 with techniques & outcomes. Table 5.1: Categorization of RBS sites considering power & voltage constrains Table 5.2: Details of RBS sites having highest Gen running & possibility of the solutions Table 5.3: Categorization of RBS sites to 4 models considering existing site conditions Table 5.4: Environmental requirements of the standard RBS equipments Table 5.5: Design requirements of the RBS Models in detail Table 5.6: Advantages & Disadvantages of Electronic Servo / Electro - Mec. Design Table 5.7: Advantages & Disadvantages of Solid State Saturable Reactor Design Table 5.8: Advantages & Disadvantages of Magnetic Induction Solid State Design Table 5.9: Advantages & Disadvantages of Ferro-Resonant - Super Isolation Design Table 5.10: Advantages & Disadvantages of Elec. Tap Changing Solid State Design Table 5.11: Energy efficient equipment replacements for telecom sites Table 5.12: Short Duration Voltage Variation categories Table 5.13: Maximum harmonic current distortion as per the IEEE 519 Table 5.14: Supply voltage measurement as per European Standard, EN 50160 Table 6.1: Main categories & Information Sources of Direct Financial Benefits Table 6.2: Main categories & Information Sources of OPEX Reductions Table 6.3: Main categories & Information Sources of Technical Benefits Table 6.4: Summary of network outages in last 4 months Table 6.5: Summary of Customer Complains in last 4 months Table 6.6: Summary of the budgeted OPEX categories for maintenance ix Table 6.7: Summary of the actual OPEX in last 4 months Table 7.1: Generator operation cost vs. running hours at radio base station site. Table 7.2: Tariff Charges on post paid customers. Table 7.3: Tariff Charges on pre paid customers. Table 7.4: Tariff Charges on IDD customers. Table 7.5: Revenue calculation on call charges for a period of 24 hours Table 7.6: Revenue saving per day calculation on each RBS Model Table 7.7. Details of RBS sites having highest Gen running & possibility of the solutions Table 7.8: Total saving per day calculation on each RBS Model