60 References 1. R. N. Charette, "Why software fails [software failure]," Spectrum, IEEE, vol. 42, no. 9, pp. 42-49, September 2005. [Online]. Available: http://dx.doi.org/10.1109/MSPEC.2005.1502528 2. A. Begel and N. Nagappan, "Usage and Perceptions of Agile software development in an Industrial Context: An Exploratory Study", in Empirical Software Engineering and Measurement, 2007. ESEM 2007. First International Symposium on, 2007, pp. 255-264. 3. C. Larman and V. R. Basili, “Iterative and Incremental development: A Brief History”, Computer, vol 36, no. 6, pp. 47-56, June 2003. 4. A. Cockburn, “Agile software development: The Cooperative Game. Agile development Series”. Cockburn, A. and Highsmith, J., eds, 2nd ed., Boston: Addison-Wesley 2007. 5. A. Marchenko and P. Abrahamsson, "Scrum in a multi project environment: An ethnographically-inspired case study on the adoption challenges," in Agile, 2008. AGILE '08. Conference, August 2008, pp. 15-26. [Online]. Available: http://dx.doi.org/10.1109/Agile.2008.77 6. B. Boehm, "Get Ready for Agile Methods, with Care," IEEE Computer, pp. 64 - 69, January, 2002. 7. T. Dybå and T. Dingsøyr, "Empirical Studies of Agile software development: A Systematic Review", Information and software Technology, 2008, doi: 10.1016/j.infsof.2008.01.006 8. B. Boehm and R. Turner. (2004) “Balancing agility and discipline: Evaluating and integrating agile and plan-driven methods”, Proceedings of the 26th International Conference on Software Engineering, 718-719. 61 9. M. Lindvall, D. Muthig, A. Dagnino, C. Wallin, M. Stupperich, D. Kiefer, J. May, and T. Kahkonen, "Agile software development in Large Organizations", Computer,vol. 37, pp. 26-34, 2004. 10. C. Mann and F. Maurer, "A case study on the impact of scrum on overtime and customer satisfaction," in ADC '05: Proceedings of the Agile development Conference. Washington, DC, USA: IEEE Computer Society, 2005, pp. 70- 79. [Online]. Available: http://dx.doi.org/10.1109/ADC.2005.1 11. M. Beedle, M. Devos, Y. Sharon, K. Schwaber and J. Sutherland. "Scrum: A Pattern Language for Hyperproductive software development." In Pattern Languages of Program Design 4, edited by N. Harrison, B. Foote and H. Rohnert. Addison-Wesley, 2000. 12. J. Sutherland, "Agile development: Lessons Learned from the First Scrum," Cutter Agile project management Advisory Service: Executive Update, vol. 5, pp. 1-4, 2004. 13. K. Schwaber, "Scrum development Process," in OOPSLA Business Object Design and Implementation Workshop, J. Sutherland, D. Patel, C. Casanave, J. Miller, and G. Hollowell, Eds. London: Springer, 1997. 14. L. Rising and N. S. Janoff, "The Scrum software development process for small teams," software, IEEE, vol. 17, no. 4, pp. 26-32, August 2002. [Online]. Available: http://dx.doi.org/10.1109/52.854065 15. M. Fowler and J. Highsmith, "The Agile Manifesto," 2001. [Online]. Available: http://agilemanifesto.org. 16. P. Deemer,G. Benefield and C. Larman, “The Scrum Primer”, Scrum Training Institute, www.ScrumTI.com, 2008. 62 17. O. Salo and P. Abrahamsson, "Agile Methods in European Embedded development Organizations: a survey study of Extreme Programming and Scrum." IET software , 2008, vol 2, pp. 58-64. 18. T. Chow and D. B. Cao, "A survey study of critical success factors in Agile software projects," Journal of System software ., vol. 81, no. 6, pp. 961-971, 2008. [Online]. Available: http://dx.doi.org/10.1016/j.jss.2007.08.020 19. K. Schwaber, Agile project management with Scrum. Redmond, Wash.: Microsoft Press, 2004. 20. J. Sutherland and K. Schwaber, “The Scrum Papers: Nuts, Bolts and Origins of an Agile Process”, 2007. [Online]. Available: http://www.jeffsutherland.com/scrum/ScrumPapers.pdf 21. Hanakawa, N. and Okura K. (2004) A project management support tool using communication for agile software development, Proceedings of the 11th Asia- Pacific software Engineering Conference (APSEC’04), 316-323 22. J. Cho, Y. Kim, and D. Olsen, "A case study on the applicability and effectiveness of Scrum software development in mission-critical and large- scale projects," in Americas Conference on Information Systems (AMCIS), 2006. [Online]. Available: http://aisel.aisnet.org/amcis2006/445/ 23. V. Mahnic and N. Zabkar, “Measurement repository for Scrum-based software development process” in CEA’08, 2nd WSEAS int. Conf on computer engineering and applications, Acapulco, Mexico, 2008. 24. J. Sutherland, G. Schoonheim, N. Kumar, V. Pandey and S. Vishal, “Fully Distributed Scrum: Linear Scalability of Production between San Fransisco and India”, agile, pp. 277-282, 2009 Agile Conference, 2009. 63 25. R. Moore, K. Reff, J. Graham, and B. Hackerson,"Scrum at a Fortune 500 Manufacturing Company", in AGILE 2007, 2007, pp. 175-180. 26. M. Cohn and D. Ford, "Introducing an agile process to an organization [software development]", Computer, vol. 36, pp. 74-78, 2003. 27. C. Schwaber, G Leganza and D D’Silva. The Truth About Agile Processes. [Online] available : http://www.forrester.com/go?docid=41836. 28. B. Schatz and I. Abdelshafi. Primavera gets Agile: A successful transition to Agile development. IEEE software. 22(3). 2005 29. N. Sridhar, M. RadhaKanta, and M. George, "Challenges of migrating to agile methodologies", Commun. ACM, vol. 48, pp. 72-78, 2005. 30. D. Leffingwell and H. Smits, "A CIO's playbook for adopting the Scrum method of achieving software agility," August 2005. [Online]. Available: http://www.rallydev.com/.../4-a-cio's-playbook-for-adopting-the-Scrum - method-of-achieving-software -agility.html