Institutional-Repository, University of Moratuwa.  

Impact of tender procedure on the performance of doner funded projects in Sri Lanka

Show simple item record

dc.contributor.advisor Wedikkara C
dc.contributor.advisor De Mel J
dc.contributor.author De Silva, GSS
dc.date.accessioned 2011-06-10T10:06:23Z
dc.date.available 2011-06-10T10:06:23Z
dc.identifier.citation De Silva, G.S.S. (1998). Impact of tender procedure on the performance of doner funded projects in Sri Lanka [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/1041
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/1041
dc.description.abstract The World Bank has it's own procurement procedures and documentation to be followed by the borrowers of the bank. The Bank dictate these procurement procedures to safeguard their interests. By this act, the benefit gained from the project often diminishes and the employers' procurement and contractual options that could be used to address the real country specific problems are neglected. Thus, the increasing procurement problems and failures indicate the importance of re-appraisal of such procedures and documentation. This study is aimed at first, investigating the impact of procurement method, more specifically the tendering process, on the perforniance of the World Bank funded projects in Sri Lanka. Second, to compare evaluate the relevance of the wold bank procurement procedure and the government of Sri Lanka procurement procedure for the success of projects. The study revealed that the procurement process significantly affect the performance of the World Bank funded projects. Specially there is a grave concern on the time and quality targets of world bank projects. Cost targets seemed to be reasonably met by the contractors. The possibility of enhancing the performance by introducing country specific. procedure is workable only for few factors. In general, the possibility of enhancement is rather marginal.
dc.subject BUILDING ECONOMICS-THESIS
dc.subject THESIS
dc.subject PROJECT MANAGEMENT
dc.title Impact of tender procedure on the performance of doner funded projects in Sri Lanka
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc en_US
dc.identifier.department Building Economics en_US
dc.date.accept 1998
dc.identifier.accno 71681 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record