Abstract:
Distribution Transformers are costly and critical equipments in electricity distribution
network. The Ceylon Electricity Board (CEB) has nearly 24,500 number of distribution
transformers installed island wide which are connected to 11kV or 33kV Medium Voltage
(MV) networks to meet the present power demand of consumers.
Failure of a distribution transformer results to interruption of power supply to the consumers
and involve high expenditure in repair or replacement of transformer. Hence protection of
distribution transformer is very important. Transformer failure rate of the CEB is nearly
2.5% where internationally acceptable level is less than 2%.
When a Distribution Transformer is failed, it is replaced with a new transformer, but there is
no proper method established by the CEB to analyze the cause of failure. A detailed
investigation of failed transformer is vital important to understanding the actual failure
scenario and prevent further incidents.
The objective of the study was to identify main causes of distribution transformer failures
and propose measures to minimize those failures. This thesis presents the CEB distribution
substation installation practices and practical situation of distribution substations which
would be the causes for failures. Detail investigation procedure for failed transformers was
established in order to find out actual cause for each transformer failure.
Through the literature review, different failure modes were identified for each transformer
component and common transformer failure causes are lightning, short circuit faults in
network, aging, overloading, oil leaks, loose connections and bad workmanship. Failed
transformers during the year 2011 were inspected in order find the root causes for failures.
It was observed that lightning and overloading are the major causes for transformer failures
in Southern Province. It was observed that 28% of transformer failures are due to lightning
and 25% are due to overloading.
Onsite investigations were carried out and failed transformers were opened whenever
necessary to identify the exact causes for failures. Several tests were done before opening
failed transformers such as insulation resistant test, polarization index test, ratio test and LV
short circuit test.
To minimize transformer failures, several measures were proposed. Maintaining the surge
arrestor earth electrode resistance less than 10Ω, replacing of faulty surge arrestors,
installation of LV surge arrestors, proper fuse selection, balancing of loads, and proper
crimping of lugs are few recommendations. It is strictly recommended to train the field staff
to follow the CEB construction standards of distribution substations when constructing as
well as doing operation and maintenance works.