The Reshuffle of contractual liabilities by Implementing Integrated Project Delivery (IPD) in Building Information Modelling (BIM) based construction

Show simple item record

dc.contributor.author Madusanka, IK
dc.contributor.author Jayasena, HS
dc.date.accessioned 2015-04-07T20:04:11Z
dc.date.available 2015-04-07T20:04:11Z
dc.date.issued 2015-04-08
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/10755
dc.description.abstract The shift from traditional procurement systems, towards more collaborative procurement systems which are backed-up with information and communication technology (ICT), is becoming the new trend in the present day construction industry around the world. Integrated Project Delivery (IPD) and Building Information Modelling (BIM) are the two most emerging and widely used systems to achieve this shift. These concepts are likely to be the new industry standard in the near future due to their collaborative nature, ability to implement sustainable procurement strategies, risk and reward sharing basis and high efficiency of construction by promoting dry construction. Yet, the Sri Lankan construction industry is still following the traditional rigid and highly separated procurement systems with traditional 2D computer aided drafting (CAD). Therefore adopting and continuing BIM and IPD will generate many issues and risks since the industry is used to the bsolute opposite of the underlying principles of both BIM and IPD. Under this context, a research is conducted with a broader aim of identifying the potential reshuffle of risks, which a construction project in Sri Lanka would be subjected, if it is delivered through BIM based IPD. This paper contains the preliminary findings of a literature review conducted on the current risks the industry faces and on identifying the requisites of BIM and IPD. en_US
dc.language.iso en en_US
dc.source.uri http://www.suranga.net/publications/2013_bim_risk_reshuffle.pdf en_US
dc.subject Building Information Modelling (BIM) en_US
dc.subject Integrated Project Delivery (IPD) en_US
dc.subject Risks en_US
dc.subject Sri Lanka en_US
dc.subject Sustainability en_US
dc.title The Reshuffle of contractual liabilities by Implementing Integrated Project Delivery (IPD) in Building Information Modelling (BIM) based construction en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2013 en_US
dc.identifier.conference World Construction Symposium [2nd] en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos pp. 435-440 en_US
dc.identifier.proceeding The 2nd World Construction Symposium : proceedings : socio-economic sustainability in construction : practice, policy and research en_US
dc.identifier.email suranga@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record