Institutional-Repository, University of Moratuwa.  

Development of a cost based optimization technique for tower line design

Show simple item record

dc.contributor.advisor Wijayatilake, ACS
dc.contributor.advisor Rodrigo, A
dc.contributor.author Rathnayaka, RKAN
dc.date.accessioned 2015-07-06T08:25:26Z
dc.date.available 2015-07-06T08:25:26Z
dc.date.issued 2015-07-06
dc.identifier.citation Rathnayaka, R.K.A.N. (2014). Development of a cost based optimization technique for tower line design [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/10982
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/10982
dc.description.abstract Overhead high voltage and medium voltage transmission using tower lines is a common practice all over the world. Tower line construction projects integrate high costs while about 25 % of the cost is for tower metallic parts and 30 % of that is for foundation and erection [1]. Developed economies trying to achieve the cost optimization of tower lines by optimum spotting of towers at designing stage and several techniques have been developed in that purpose. In Sri Lanka, the process of planning, design and construction of transmission and medium voltage power lines is solely authoritative by Transmission Licensee and Five Distribution Licensees of the country. Until now, these six licensees and contractual parties, who are involved in power line construction process, do not use any systematic method for cost optimization in line design and construction. As the first step of this study, a research survey was done about available line design techniques, design criteria and constraints and available cost optimization techniques. Data were collected on available structure types, most recent structure costs, foundation costs and erection costs. This report will discuss the Dynamic Programming algorithm which gives the choice of available towers (structure) and sites of the towers for given survey data of a transmission line route, in such a way that the overall cost of running the line from one end of the route to the other, subject to all the design constraints, is a minimum. A software tool was developed which runs based on the developed dynamic programming algorithm. The software tool chooses and sites the towers, given the survey data of a transmission line route, available tower types and conductor parameters. By developed software tool, several experiments and re-designing were done using profile survey data of some constructed and existing 33 kV tower lines under Projects and Heavy Maintenance Branch-Region 01 of Ceylon Electricity Board (CEB) from year 2010. The results were compared with the initial designs and it has shown that a reasonable cost reduction can be achieved, and that cost reduction is varying with total line length, and characteristics of the line route. en_US
dc.language.iso en en_US
dc.subject ELECTRICAL ENGINEERING-Dissertation en_US
dc.subject POWER GENERATION-Sri Lanka
dc.title Development of a cost based optimization technique for tower line design en_US
dc.type Thesis-Abstract en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc. en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2014
dc.identifier.accno 107093 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record