Show simple item record

dc.contributor.author Ganeshu, P
dc.contributor.author Disaratna, PAPVDS
dc.contributor.author Francis, M
dc.date.accessioned 2015-08-20T08:07:15Z
dc.date.available 2015-08-20T08:07:15Z
dc.date.issued 2015-08-20
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/11213
dc.description.abstract The “estimating process” is a significant element within the circle of construction due to the lack of financial resources available. Tender cost estimating in Sri Lankan construction industry requires extensive knowledge and expertise. This research proposed a best estimation practice to the Sri Lankan construction industry. This study expects it will fulfil the research gap and uplift the Sri Lankan contractors’ current estimation practice. The aim of this research is to suggest solutions to address the limitations of current estimating practice prevailing in the Sri Lankan construction industry comparing to the proposed best estimation practice. This research has been conducted through literature reviews, questionnaire survey and interviews. The questionnaire included sixteen steps identified as the best estimation practice through literature review and interviews, with a view to find out the current estimation practice of Sri Lankan contractors. The analysis of data revealed although they are following all sixteen steps, they couldn’t able to gain the maximum benefit of those steps owing to some limitations. Therefore in order to find out the solutions for those limitations Seventeen interviews were carried out. Among those, nine interviews were from contractors and eight interviews were from consultants. These conclude that limitations and solutions identified by the contractors were similar with those identified by the consultants. In the comparison of their opinions the degree of agreement on most of the factors between them is high. It shows consultants’ understanding about contractors’ works are quite high. The study recommended that both contractors and consultants give more attention to the cost estimating process to manage the projects in a better way and to hire qualified technical staff in order to obtain an accurate estimate. Contractors were requested to keep databases and to make relevant changes and modifications in their existing estimating practices in their future projects. en_US
dc.description.sponsorship International Council for Research and Innovation in Building and Construction (CIB) en_US
dc.language.iso en en_US
dc.subject Accuracy en_US
dc.subject Consultants
dc.subject Contractor
dc.subject Tender Cost Estimation
dc.title Comprehensive Study about Sri Lankan Contractors’ Estimation Practice en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.department Department of Building Economics, University of Moratuwa, Sri Lanka en_US
dc.identifier.year 2015 en_US
dc.identifier.conference The 4th World Construction Symposium 2015 en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos p 181-191 en_US
dc.identifier.proceeding Sustainable Development in the Built Environment: Green Growth and Innovative Directions en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record