Institutional-Repository, University of Moratuwa.  

Statistical approach to minimize waste in tyre manufacturing process : a case study

Show simple item record

dc.contributor.advisor Peiris, TSG
dc.contributor.author Dilrukshi, RK
dc.date.accessioned 2015-08-27T10:57:04Z
dc.date.available 2015-08-27T10:57:04Z
dc.date.issued 2015-08-27
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/11290
dc.description.abstract The main focus of this study was to assess the wastes occurring because of defect tyres in air tyre manufacturing process in the Loadstar Pvt. Limited. This lost accounts for 37.75 million during the last five months. In this study a complete statistical analysis about defect tyres were carried out for five tyre types in air tyre manufacturing process by means of Parato diagram. The average run lengths were found for each tyre type. Explanatory statistical analysis revealed that the defect tyre cost is high due to factors such as under cure, bladder pleat, air bubble in, plate damage, air bubble lug, low pressure and less side wall thickness. These statistical analyses are recommended to help manufacturers to identify the exact issues in the manufacturing process and rectify those. en_US
dc.language.iso en en_US
dc.subject Average run length en_US
dc.subject Chi-square test
dc.subject NP chart
dc.subject Parato diagram
dc.subject P chart
dc.subject X-bar chart
dc.title Statistical approach to minimize waste in tyre manufacturing process : a case study en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Business Statistics en_US
dc.identifier.department Department of Mathematics en_US
dc.date.accept 2015
dc.identifier.accno 108974 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record