Institutional-Repository, University of Moratuwa.  

EFFECTIVENESS OF ALTERNATIVE DISPUTE RESOLUTIONMETHODS USED IN THE HIGHWAY CONSTRUCTION PROJECTS IN SRI LANKA

Show simple item record

dc.contributor.advisor Critical Factors in Dispute Resolution
dc.contributor.advisor Expressway Construction Projects
dc.contributor.advisor DAB;Cross Case Analysis.
dc.contributor.author Gammanpila, CM
dc.contributor.author Abeynayake, M
dc.date.accessioned 2016-08-29T05:54:04Z
dc.date.available 2016-08-29T05:54:04Z
dc.date.issued 2016-08-29
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/11958
dc.description.abstract Effectiveness of dispute resolution affects immensely for success or failure of construction projects. This document consists of a literature review about alternative dispute resolution (ADR) methods including negotiation, mediation, Dispute Adjudication Board (DAB), ad-hoc adjudication, arbitration and ten critical factors affecting to effectiveness of ADR methods such as cost, speed, relationships, fairness etc. After decades of use there is no clear detailed analysis about used alternative dispute resolution in highway projects for their effectiveness and efficiency. In order to fulfil this gap, this research is conducted to evaluate effectiveness of used ADR methods regarding ten critical factors. The research methodology adapted was qualitative within multiple case studies from disputes arisen in Expressway Construction projects. The primary data collection techniques used in this study were ADR documents and semi structured interviews. Content analysis was used to analyse these documents and cross case analysis to compare cases findings to each other. The research findings revealed that ratings for critical factors fluctuate from case to case significantly. In the discussion of research findings, key attributes identify which was the cause for fluctuations. So one cannot simply say this or that factor affects most to the success and this ADR method is best way to deal with disputes. According to study it’s not fair to deal with every dispute in the same manner, so categorization of disputes concerning key attributes needed for improved efficiency of ADR methods. Guidelines developed include steps, tables and flowcharts for using ADR methods effectively. These findings and guidelines are presented in a logical, systematic and a sensible way to identify the ideal ADR method for a given dispute rather than relying on subjective decisions. It is hoped that these findings and guidelines will be useful to the stakeholders in future highway projects and can be adapted to the whole industry. en_US
dc.language.iso en en_US
dc.subject Alternative Dispute Resolution en_US
dc.subject Critical Factors in Dispute Resolution
dc.subject Expressway Construction Projects
dc.subject DAB
dc.subject Cross Case Analysis.
dc.title EFFECTIVENESS OF ALTERNATIVE DISPUTE RESOLUTIONMETHODS USED IN THE HIGHWAY CONSTRUCTION PROJECTS IN SRI LANKA en_US
dc.type Conference-Full-text en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2016 en_US
dc.identifier.conference The 5th World Construction Symposium 2016 en_US
dc.identifier.place colombo en_US
dc.identifier.pgnos pp. 174-185 en_US
dc.identifier.email chandith.manasa@gmail.com en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record