Show simple item record

dc.contributor.advisor Ranasinghe, KAMK
dc.contributor.author Thoradeniya, DL
dc.date.accessioned 2017-06-05T09:19:10Z
dc.date.available 2017-06-05T09:19:10Z
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/12784
dc.description.abstract Public Private Partnerships (PPPs) are defined as “…a cooperative venture between the public and private sectors, built on the expertise of each partner that best meets clearly defined public needs through the appropriate allocation of resources, risks, and rewards”. It is noted that not all PPP projects are successful. This has resulted in a number of studies focused on identifying critical success factors in order to maximize advantages and reduce risks for all parties involved in the project. The Colombo Port City Project (CPCP) is widely regarded as the largest and most ambitious Sri Lankan PPP and Foreign Direct Investment (FDI) undertaking to date and is a collaborative project between the Government of Sri Lanka (GOSL) and the China Harbour Engineering Corporation (CHEC) Port City Colombo (Pvt) Ltd. The project faced early setbacks and controversy due to alleged mishandling of key processes. This study provides an in depth analysis of the CPCP which provides valuable insights on the nature of PPP projects in the Sri Lankan context. This in turn helped establish the factors to be considered for the successful implementation of future PPP projects in Sri Lanka and other developing nations. Information was gathered from the review of various types of literature, key informant interviews and a questionnaire survey. Attempts were made to contact a wide range of respondents with various levels of involvement in the project in order to obtain a holistic view of the project and its issues. The Summary Cost Benefit Analysis (CBA) was reviewed and the separation of the CBA based on GOSL and CHEC perspectives indicated that the GOSL receives a lower Net Present Value (NPV) and Internal Rate of Return (IRR) compared to the Summary CBA, while the CHEC receives a negative NPV. This indicates that the Chinese backed CHEC’s motives for the project are likely to be strategic, long term economic and political benefits. The findings revealed that fewer than 66.7% (2/3rd) of the population support the CPCP due to environmental, social and political concerns. Fewer than 66.7% (2/3rd) of the population believe that the CPCP is a PPP, although there is agreement of the presence of some PPP characteristics in the CPCP. The analysis of major issues indicated that although the media primarily reported on environmental issues, political and governance issues too were considered very important.The ranking of Critical Success Factors (CSFs) indicated that there is a considerable difference between the ranking of CSFs in the Sri Lankan context and in other countries such as Australia and the UK. The Sri Lankan study reveals that overall, respondents placed greater importance on non-economic CSFs relating to governance and politics in comparison to rankings by other countries in previous studies. However, the ranking of CSFs based on the perspective of supporters of the CPCP preferred to assign greater importance to economic CSFs, indicating that their support is based on the perceived economic benefits of the project. In contrast, those who oppose the project ranked political and governance issues much higher than most economic CSFs indicating that their opposition is based on concerns over political and governance issues. The general percentage agreement between the two groups was very low at only 34.4%. However, the ranking of ‘a favourable legal framework’ and ‘conducting in-depth studies for a through and sufficient EIA’ were ranked in the top 5 by all parties, while ‘the ability of regulatory authorities to act independently’ and ‘consideration of demands placed by the project on existing infrastructure were ranked in the top 2 spots overall en_US
dc.language.iso en en_US
dc.subject Civil Engineering
dc.subject Public Private Partnerships(Ppps)
dc.subject Colombo Port City Project(Cpcp)
dc.title Public-private partnerships : the case study of the Colombo fort city en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc (Major Component Research) en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2016-12
dc.identifier.accno TH3292 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record