dc.description.abstract An evaluation of potential waste heat recovery opportunities from boiler continuous blowdown system in Lakvijaya coal power station was carried out to assess the waste heat availability, recovery methods and introduced a mathematical model for energy extraction per unit capital cost for the proposed energy recovery system. Calculated total waste heat availability from all three boilers in the power station varies from 3,950 kW to 11,851 kW, when boiler continues blowdown rate changes from 10,250 kg/h to 30,750 kg/h. Two possible opportunities to recover waste heat have been identified. They are considered for working as a heating fluid for heat exchanger to heat up condensate water and the other as a heat source for vapour absorption chiller for partially or fully replace currently use electrically driven vapour compression air conditioning chillers having total cooling capacity of 2,500 kW. Proposed new layout for boiler blowdown system with new components include a heat exchanger and an absorption chiller. The consequently analysed energy system is in terms of energy extraction and energy extraction per unit capital cost by varying heat exchanger outlet waste heat fluid temperature and boiler continues blowdown rate. A regression model was developed to heat exchanger capital cost by using Minitab statistical software and required cost data to build a model was taken from CAPCOST ver2 software. From the results it is observed that energy extraction per unit capital cost is optimum at heat exchanger outlet temperature in between 120 0C to 95 0C, where affect from absorption chiller was insignificant and result was similar in both single stage and two stage chiller machines. Two regression models were developed for energy extraction for unit capital cost with four variables and R-sq values were 86.66% and 76.86% for two stage chiller and single stage chiller system respectively. This model can be used to find optimal points in similar applications. en_US
dc.language.iso en en_US
dc.subject boiler waste heat recovery en_US
dc.subject continuous blowdown en_US
dc.subject condensate water preheating en_US
dc.subject vapour absorption chiller en_US
dc.subject capital cost estimation en_US
dc.subject energy extraction per unit capital cost en_US
dc.subject mathematical modelling en_US
dc.subject thermodynamic analysis en_US
dc.subject sensitivity analysis. en_US
dc.title Evaluation of potential waste heat recovery opportunities from the boiler continuous blowdown system in Lakvijaya power station en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MEng in Energy Technology en_US
dc.identifier.department Department of Mechanical Engineering en_US
dc.date.accept 2017-12
dc.identifier.accno TH3523 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record