Institutional-Repository, University of Moratuwa.  

Performance analysis of an installed wind, solar, diesel and battery hybrid power system

Show simple item record

dc.contributor.advisor Attalage, RA
dc.contributor.author Jayasinghe, AGANB
dc.date.accessioned 2018-07-25T23:48:44Z
dc.date.available 2018-07-25T23:48:44Z
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/13307
dc.description.abstract Hybrid power system is identified as most economical solution for providing electricity to communities currently isolated from the national grid and mostly main land. Recently, first Solar wind diesel Battery Hybrid commissioned in one of the northern Island of Sri Lanka called Eluvathivu, as a pilot power plant for demonstrating the maturity and feasibility of hybridization of different power sources. One of other objective of implementing this project was train CEB staff to prepare them for implementing similar projects on the other Islands. During this study performance analysis of this power system was carried out using HOMER pro software. It was identified that initial capital cost of the hybrid system is more than 10 times higher than diesel power system. However present worth value of the hybrid system will be and discounted payback will be less than 4 years. Sensitivity analysis was done using future load demand demonstrates that design configuration of hybrid power system can be sustained maximum average load up to 235kWh/day and when the hybrid system operates in higher load demands than design, overall efficiency of the system increases. Sensitivity analysis was done for possible expansion of the current system illustrates installed configuration is the optimum configuration to meet the site conditions. Performance of the hybrid system very much depends on wind speed of the Island. When the wind speed exceeds cut in speed of wind turbines, 1m/s of increment of wind speed will result more than 6% increment of renewable fraction of the system. 0.5 kWh/m2/day increment of solar scaled average increment will generate around 7000kWh/ year of additional electrical energy. However cost of energy and net present cost of the power system do not depend on the variation of solar radiation since almost all the additional energy generated due to increment of solar radiation is accounted as excess energy to the system. When analyzed using actual data of hybrid power system with output predicted by using HOMER Pro, it was observed that HOMER Pro under estimates total renewable energy generation and total unmet load of the hybrid system and overestimates generated energy by the diesel generator and total electricity consumption. Therefore estimated values of COE and NPC are over estimated en_US
dc.language.iso en en_US
dc.subject Eluvathivu Island en_US
dc.subject HOMER Pro en_US
dc.subject Hybrid Power System en_US
dc.title Performance analysis of an installed wind, solar, diesel and battery hybrid power system en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MEng in Energy Technology en_US
dc.identifier.department Department of Mechanical Engineering en_US
dc.date.accept 2017-12
dc.identifier.accno TH3522 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record