Institutional-Repository, University of Moratuwa.  

Strategies to minimise errors in contract documents to minimise disputes in building projects in Sri Lanka

Show simple item record

dc.contributor.advisor Disaratne, V
dc.contributor.author Bandara, RPHS
dc.date.accessioned 2018-11-21T03:12:58Z
dc.date.available 2018-11-21T03:12:58Z
dc.identifier.citation Bandara, R.P.H.S. (2018). Strategies to minimise errors in contract documents to minimise disputes in building projects in Sri Lanka [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/13695
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/13695
dc.description.abstract Disputes are not new feature to the construction industry and due to disputes; construction projects exceed the time, cost, and end with a poor quality product. Hence, avoiding disputes before it arises is vital to industry. Numerous causes for disputes have been investigated during last twenty years. Among them errors in contract documents has been identified as one of the key causes of disputes in the Sri Lankan construction industry. Therefore, strategies has to be investigated to minimise errors in contract documents to avoid disputes arise due to errors. Accordingly, the aim of the research study is to develop a framework to minimise errors in contract documents to minimise disputes in the building projects. Multiple case study method was selected as the most suitable research method for this study. The reasons being, the study needed to focus on in-depth decisions and behavioural attitudes of construction professionals who involve in the construction projects. Furthermore, the primary source of data was collected through semi-structured interviews. Data were analysed adopting content analysis method. The ultimate findings of the study were categorised based on the key documents, which comprises in the contract documents such as; BOQ, drawings, specifications and conditions of contracts. Strategies were investigated and which help to minimise errors in contract documents. Among them recruiting competent professional to the construction projects, allocating adequate time to prepare contract documents, work as a team, contractor’s involvement from the beginning, educating consultants about contract documents, providing detailed information about the project from the beginning, were the key techniques to mitigate errors in the contract documents. en_US
dc.language.iso en en_US
dc.subject Contract documents en_US
dc.subject Errors in contract documents en_US
dc.subject Disputes en_US
dc.subject Construction projects en_US
dc.title Strategies to minimise errors in contract documents to minimise disputes in building projects in Sri Lanka en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.degree Master of Science in Construction Law and Dispute Resolution en_US
dc.identifier.department Department of Building Economics en_US
dc.date.accept 2018-02
dc.identifier.accno TH3607 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record