Show simple item record

dc.contributor.advisor Siriwardana CSA
dc.contributor.author Karunarathna DMTGNM
dc.date.accessioned 2019
dc.date.available 2019
dc.date.issued 2019
dc.identifier.citation Karunarathna, D.M.T.G.N.M. (2019). A Tool to assess and improve the construction worker productivity [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/15760
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/15760
dc.description.abstract Construction workers are the basic unit of the construction industry. The behaviour of construction workers is considered variable, which impacts on worker productivity. Therefore, obtaining the highest levels of performance is crucial to be competitive in the construction industry. The scarcity of skilled workers, increase of many high-rise building projects and changes in the economic and political conditions aggravated the need of seeking strategies to improve the performances of construction workers. In the construction industry, contractors attempt to improve the workers’ productivity with the aim of profit. Few frameworks which are connected were developed using different kind of research techniques. Firstly the existing productivity measurement techniques were thoroughly studied. Furthermore frequent and critical errors and reworks in the building construction, causesof delay, factors affecting sub-contractor performance were identified and studied. In this study, the main focus is to setup relevant assessment frameworks to assess the productivity of Sri Lankan construction sites. To have a complete productivity assessment, a new framework was put forward considering an Initial and Detailed Assessment. The initial assessment was developed to get a relative measure of productivity according to the external conditions other than labour and management. As the first step, critical factors that affect productivity were identified. Then, a few surveys were carried out to categorize and weight the factors. Detailed Assessment will be fulfilled on the basis with Activity Analysis to investigate root causes and improvements for the poor performance. It will mainly focus on sub-contractor performance on progress, direct work percentage and. worker performance benchmarking. Further errors and rework reduction framework and sub-contractor assessment framework was connected to detailed assessment. Developed sub-contractor assessment is mainly a factor based assessment. It is reinforced with onsite data to cross check the performance and assessment value. Activity analysis results, crew wise errors and rework amount, attendance records and other available management records in different divisions in the site are connected to the sub-contractor assessment process Analyzing the nature, frequent areas, and trends was identified as a key to minimize the repetitive errors. In a large construction site mainly high rise building construction projects most of the towers are having typical floors. In the framework which is a major part in detailed assessment, possible errors and reworks were identified under three main stages structural, masonry and finishing. Finally, the developed frameworks are incorporated into a template which can easily be plugged into a web tool. An initial version of the web-tool (“Enhancer”- enhancer.lk) was developed. The “Enhancer” tool can analyse the performance using a set of developer productivity tools. The tool can suggest best practices according to the inserted data and information. Furthermore, it can work as a helping hand for productivity improvement. The developed productivity improvement framework was implemented in a building construction project in Sri Lanka, and it was able to contribute to the productivity improvement process. Additionally, six presentations and knowledge and research finding sharing sessions were successfully carried out and received very good feedback from the experts who were in the audience. en_US
dc.language.iso en en_US
dc.subject CIVIL ENGINEERING-Dissertations en_US
dc.subject CONSTRUCTION INDUSTRY-Labour Productivity en_US
dc.subject LABOUR PRODUCTIVITY en_US
dc.subject Performance improvement en_US
dc.subject Sub-contractors en_US
dc.subject Productivity en_US
dc.subject Activity Analysis en_US
dc.title A Tool to assess and improve the construction worker productivity en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Civil Engineering - By research en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2019
dc.identifier.accno TH3937 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record