Institutional-Repository, University of Moratuwa.  

Exploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lanka

Show simple item record

dc.contributor.advisor de Silva L
dc.contributor.author Tharanga KC
dc.date.accessioned 2019
dc.date.available 2019
dc.date.issued 2019
dc.identifier.citation Tharanga, K.C. (2019). Exploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lanka [ Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/15866
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/15866
dc.description.abstract The aim of this research is explore the barriers in implementation of Total Quality Management System in flyover construction projects in Sri Lanka. The research model was developed with the help of previous studies to get a guide. Identification of different factors that affect for the implementation of TQM in the construction project were identified with the guide of previous studies and the general discussion had with the experts in the industry. A comprehensive literature was conducted to acquire knowledge on quality, to understand the quality systems used in the construction sector and to identify different factors/barriers that affect for the quality management and implementation of TQM. To understand barriers in implementation of TQM, data was collected from employees such as project managers, engineers, surveyors and quantity surveyors who have been participated in flyover projects in Sri Lanka. The data was collected using quantitative survey and using questionnaires that were distributed by hand or through e mail. The collected data was analyzed by using SPSS for measure the internal consistency (reliability) of the data set collected from the questionnaire survey and it gave grater internal consistency. Descriptive statistics and mean score method have been used to identify critical barriers against the TQM implementation. Based on results, 5 numbers of barriers were identified as low impacted barriers (Green zone), 13 numbers of barriers were identified as moderate impacted barriers (Yellow zone) and 7 numbers of barriers were identified as extreme impacted barriers (Red zone). The framework was developed with control measures against the extreme barriers identified in the study. In the recommendation, Trainings, team work concept, effective communication, continuous improvement, employee empowerment and employee awareness on TQM benefits are identified as major control measures. en_US
dc.language.iso en en_US
dc.subject BUILDING ECONOMICS-Dissertations en_US
dc.subject PROJECT MANAGEMENT-Dissertations en_US
dc.subject BRIDGES, HIGHWAY-Flyovers en_US
dc.subject HOGHWAY SYSTEMS en_US
dc.subject TOTAL QUALITY MANAGEMENT en_US
dc.subject CONSTRUCTION INDUSTRY-Quality Control en_US
dc.title Exploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lanka en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.degree MSc in Project Managament en_US
dc.identifier.department Department of Building Economics en_US
dc.date.accept 2019
dc.identifier.accno TH4051 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record