Factors affecting to the delay in road construction projects of local bank funding

Show simple item record

dc.contributor.advisor Perera AADAJ
dc.contributor.author Gunawardana MDL
dc.date.accessioned 2019
dc.date.available 2019
dc.date.issued 2019
dc.identifier.citation Gunawardana, M.D.L. (2019). Factors affecting to the delay in road construction projects of local bank funding [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/16000
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/16000
dc.description.abstract This study attempts to identify the delay causes factors affect to the delay of road construction projects in Sri Lanka. Road sector infrastructure developments plays major role within the development of country. Therefore, identification of delay causes factors is very crucial for the development of country. In addition to the identification of delay causes factors, ranking them according to the severity level is very important to prioritize the mitigation measures. Thirty number of sample projects were selected from the road construction projects under the Local Bank Funded Project Division for this study. Delay causes factors were identified through literature survey analysis, contractors’ claim documents and interviewing of project engineers of those projects. Identified delay causes factors from the contractors’ claim documents were analyzed according to the actual delay contribution of the individual delay factors. Then identified all the delay causes factors were evaluate quantitatively by questionnaire survey analysis with Likert scale. As per the results of the study, average time over run of the project duration due to various reasons in the Local Bank Funded Projects goes up to the 40% -68% compared to the original project duration. According to the both analysis methods Variation and scope changes, delaying of relocating utilities and Delay due to land acquisition were selected as a top three significant delay causes respectively. Above three delay causes factors represent the client’s responsibility category. In addition to above three delay causes factors Ineffective project planning and scheduling by contractor, Deficiency of some material in the country, Poor site management of contractor, less qualified persons in contractor’s key staff, Design changes, Unavailability of required number of staff in contractor’s organization and Improper availability of funds with client were selected in the top ten delay causes factors respectively according to the questionnaire survey analysis. en_US
dc.language.iso en en_US
dc.subject CIVIL ENGINEERING-Dissertations en_US
dc.subject CONSTRUCTION PROJECT MANAGEMENT-Dissertations en_US
dc.subject ROADS AND STREETS-Construction-Delays en_US
dc.subject CONSTRIUCTION INDUSTRY-Delays en_US
dc.subject CONSTRUCTION INDUSTRY-Claims en_US
dc.subject PROJECT MANAGEMENT en_US
dc.title Factors affecting to the delay in road construction projects of local bank funding en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Construction Project Managament en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2019
dc.identifier.accno TH4087 en_US