Institutional-Repository, University of Moratuwa.  

Facilitating claim establishment at the defect liability period of MEP projects: a guideline for record – keeping

Show simple item record

dc.contributor.advisor Hadiwattege C
dc.contributor.author Kumara KVP
dc.date.accessioned 2020
dc.date.available 2020
dc.date.issued 2020
dc.identifier.citation Kumara, K.V.P. (2020). Facilitating claim establishment at the defect liability period of MEP projects: a guideline for record – keeping [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/16932
dc.identifier.uri http://dl.lib.uom.lk/handle/123/16932
dc.description.abstract If any party raised a claim, the main objective is to achieve success. Researchers have found that Contractors’ claims mostly fail due to the inadequate proof documents to substantiate the claims. This study investigates the record-keeping related to claim management, with the aim of developing a guideline for record-keeping for successful claims in the MEP trade. Existing record-keeping practices were identified through a literature survey. Said existing record types were tested with industry trade experts via a questionnaire survey for the importance and applicability related to claims establishing in MEP projects during the defect liability period. Partly organised interviews and online question feedback assessments were selected as appropriate research methodologies as suitable methods are required to collect a high degree of information from the construction professionals. A total of 36 satisfactory responses were received in the questionnaire survey, representing seven (07) from employers, eleven (11) from consultants, 18 from contractors, and one (01) representing other parties. Two (02) experts from the contractor’s side and one (01) expert consultant and one (01) expert representing Engineer's side, participated in semi-structured interviews. The questionnaire survey outcome for the ranking for applicability of the records types for managing MEP claims at the defect liability period was used as the key in developing the guideline. The expert ratings on record types were treated as a high priority and incorporated to the top of the applicability ratings. The outcome was further developed by cross-checking the similar record types verified by literature review findings and confirmed by industry experts during the interview. Additional record types that were identified by the industry experts through interviews and open-ended questionnaire survey responses were compiled to the similarities and added further to the guideline covering the total record-keeping requirement for the claim success. As per the views of interview responders, the common record types of original contract document and progress photograph records on milestone completion (indicating milestone name, date, and time of completion), were rated as high priority requirement for establishing MEP related claims in DLP. The O&M manuals record was ranked third priority type. However, the record types; testing and commissioning reports, proper completion records, proper handing over records, material approvals, maintain a log for attendance for maintenance, and complaint register were newly identified as high priorities. As the scarcity of the studies available to MEP trade produced guidelines from the present study would enhance the contracted parties to schedule their record-keeping mechanism from the pretender stage for achieving the claim success. en_US
dc.language.iso en en_US
dc.subject BUILDING ECONOMICS – Dissertation en_US
dc.subject CONSTRUCTION LAW AND DISPUTE RESOLUTION - Dissertation en_US
dc.subject CONSTRUCTION INDUSTRY – Record-keeping, Records en_US
dc.subject MECHANICAL ELECTRICAL PLUMBING - Claims - Defect Liability Period en_US
dc.subject MECHANICAL ELECTRICAL PLUMBING, MEP - Projects en_US
dc.subject CONSTRUCTION CLAIMS MANAGEMENT en_US
dc.title Facilitating claim establishment at the defect liability period of MEP projects: a guideline for record – keeping en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.degree Master of Science in Construction Law and Dispute Resolution en_US
dc.identifier.department Department of Building Economics en_US
dc.date.accept 2020
dc.identifier.accno TH4433 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record