Institutional-Repository, University of Moratuwa.  

The reshuffle of contractual liabilities by implementing integrated project delivery (ipd) in building information modelling (bim) based construction

Show simple item record

dc.contributor.author Madusanka, IK
dc.contributor.author Jayasena, HS
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Fernando, NG
dc.date.accessioned 2022-03-29T05:31:40Z
dc.date.available 2022-03-29T05:31:40Z
dc.date.issued 2013-06
dc.identifier.citation Madusanka, I.K. & Jayasena, H.S. (2013). The reshuffle of contractual liabilities by implementing integrated project delivery (ipd) in building information modelling (bim) based construction . In Y.G. Sandanayake & N.G. Fernando (Eds.), Socio-economic sustainability in construction: practice, policy and research (pp. 435-440). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/17490
dc.description.abstract “Sustainability by building smarter”, the vision of buildingSMART international clearly conveys what Building Information Modelling (BIM) was developed for. BIM has now been accepted as a primary tool for sustainable project procurement. Building information modelling (BIM) is the latest innovation of construction industry and it is increasingly becoming the design standard for architectural and construction engineering. Effective adoption of the BIM requires a change in the traditional work practices, where it needed a greater collaboration and communication among project participants and efficient flow of information. Conventional procurement methods are less efficient in delivering these requirements. The Integrated Project Delivery (IPD) approach is widely recognized as the most suitable project delivery approach to receive the full benefit of BIM adoption for construction project procurement. Basic concept of IPD is the collaboration among the owner, architect, and contractor to create the core team. The team focuses on trust, transparency, shared risk and reward, value-added decision making, and technology to complete a project as efficiently and effectively. Collaborative approaches to project procurement are very rare in Sri Lanka. A concept like IPD is totally a new paradigm for the local industry. Given the context that BIM is likely to become the standard in future and the widening global competition will force the local industry to adopt methods like IPD. This research is conducted to identify the reshuffle of contractual liabilities in IPD from those in traditional delivery method, where the findings will help the industry to get prepared to face future challenges. en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders en_US
dc.relation.uri https://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.subject Building information modelling en_US
dc.subject BIM en_US
dc.subject Contractual liability en_US
dc.subject Integrated project delivery en_US
dc.title The reshuffle of contractual liabilities by implementing integrated project delivery (ipd) in building information modelling (bim) based construction en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2013 en_US
dc.identifier.conference 2nd World Construction Symposium en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos pp. 435-440 en_US
dc.identifier.proceeding Socio-economic sustainability in construction: practice, policy and research en_US
dc.identifier.email ishara.kasun89@gmail.com en_US
dc.identifier.email suranga@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record