dc.description.abstract A highway work zone is present in every part of the world due to the complete essentiality of such work. Roads are designed to a certain lifetime and once the lifetime is reached, the road needs rehabilitation. New roads are being built every day in a country like Sri Lanka where the infrastructure is still largely under development. However, unlike most countries, we do not have a lifecycle monitoring system to determine the optimum rehabilitation period nor the economic cost of rehabilitation of an existing busy road. When referring few of the previous feasibility reports, they have only considered the economic benefit gained after the road is built, but not the loss encountered while the road is being rehabilitated. This study provides insight to the exact issue of incorporating economic losses in the feasibility studies in order to increase the cost benefit ratio as much as possible. The economic cost includes vehicle operating cost, emission cost, delay time cost, and accident costs. However, in this study, only VOC and Delay time cost are monetarized while emissions are quantified without monetarizing. The simulations are carried out using World Bank’s HDM-4 version 2 software calibrated to Sri Lankan Context. Here, multiple work zones are evaluated for roughness, vehicle speed, and safety while one complete case study is performed on the most critical work zone. It was found that with the current working conditions, economic loss is around 70% of the project cost and could be considerably reduced by proper management of traffic, pavement condition, and implementing other measures. en_US
dc.language.iso en en_US
dc.subject HIGHWAY CONSTRUCTION– Sri Lanka en_US
dc.subject VEHICLE OPERATING COST en_US
dc.subject EMISSIONS en_US
dc.subject ROAD MAINTENANCE en_US
dc.subject DELAY TIME COST en_US
dc.subject OPERATING SPEED en_US
dc.subject CIVIL ENGINEERING – Dissertations en_US
dc.title Evaluation of the impact of road roughness on road user cost in highway construction work zones en_US
dc.type Thesis-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc in Civil Engineering - By Research en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2019
dc.identifier.accno TH4471 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record