Institutional-Repository, University of Moratuwa.  

Primary study of the impact of in-situ and factory products in Sri Lankan construction industry

Show simple item record

dc.contributor.author Thudugala, M
dc.contributor.author Seneviratne, LDIP
dc.contributor.editor Sandanayake, YG
dc.contributor.editor Fernando, NG
dc.date.accessioned 2022-04-26T04:03:02Z
dc.date.available 2022-04-26T04:03:02Z
dc.date.issued 2013-06
dc.identifier.citation Thudugala , M., & Seneviratne, L.D.I.P . (2013). Primary study of the impact of in-situ and factory products in Sri Lankan construction industry . In Y.G. Sandanayake & N.G. Fernando (Eds.), Socio-economic sustainability in construction: practice, policy and research (pp. 343-351). Ceylon Instituteof Builders. htps://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/17696
dc.description.abstract In an environment of aggravating labour shortage, it is inevitable for the construction industry to face number of difficulties. Therefore it is essential to explore ways and means to develop less labour intensive products, and identify whether these provide real solutions in reducing time and cost with enhanced quality. Further, it is obvious that the current construction industry is in a dilemma with lack of knowledge on behaviour of those aspects. Contactors hesitate to use factory products as these products are expensive, even these would lead to time savings and reduction of labour requirement and also towards sustainability in construction through many aspects. Therefore the need for a comparison between in-situ and factory made products on time, cost and quality is a need of time. This ongoing research mainly focuses on the usage of factory made and in-situ products based on the respective pros and cons. This was done by initiating a survey among various expertise in the industry. Further, prioritizing the most labour intensive products was very essential to identify what trade areas are the main concerns. Therefore the overall time, cost and quality aspects of in- situ products can be compared with correspondent factory products and identify the challenges on the contractors for using the effective alternatives. This paper contains the preliminary findings of a literature review conducted on the use of in-situ and factory based construction components both locally and globally. en_US
dc.language.iso en en_US
dc.publisher Ceylon Institute of Builders en_US
dc.relation.uri https://ciobwcs.com/downloads/WCS2013-Proceedings.pdf en_US
dc.subject Cost en_US
dc.subject Factory made en_US
dc.subject In-situ en_US
dc.subject Labour en_US
dc.subject Quality time. en_US
dc.title Primary study of the impact of in-situ and factory products in Sri Lankan construction industry en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Architecture en_US
dc.identifier.department Department of Building Economics en_US
dc.identifier.year 2013 en_US
dc.identifier.conference 2nd World Construction Symposium en_US
dc.identifier.place Colombo en_US
dc.identifier.pgnos pp. 343-351 en_US
dc.identifier.proceeding Socio-economic sustainability in construction: practice, policy and research en_US
dc.identifier.email manojtudugala@gmail.com en_US
dc.identifier.email isenevi@uom.lk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record