Institutional-Repository, University of Moratuwa.  

Modelling of pollutant removal rates in constructed wetlands under varying hydraulic loading rates

Show simple item record

dc.contributor.author Udukumburage, RS
dc.contributor.author Ariyasena, MADN
dc.contributor.author Rupasinghe, GGMBMB
dc.contributor.author Karunarathne, S
dc.contributor.editor Hemalal, PVA
dc.date.accessioned 2022-07-06T04:46:34Z
dc.date.available 2022-07-06T04:46:34Z
dc.date.issued 2013-06
dc.identifier.citation Udukumburage, R.S., Ariyasena, M.A.D.N., Rupasinghe, G.G.M.B.M.B., & Karunarathne, S. (2013). Modelling of pollutant removal rates in constructed wetlands under varying hydraulic loading rates. In P.V.A. Hemalal (Ed.), Proceedings of the 7th National Conference on Earth Resources Management (pp. 63-67). Department of Earth Resources Engineering, University of Moratuwa. en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/18424
dc.description.abstract A subsurface horizontal flow constructed wetland located at University of Moratuwa was observed from January 2012 to November 2012 in order to derive empirical equations for the treatment efficiencies of BOD, COD, Nitrate-N, Nitrite-N and Total Phosphorous with varying hydraulic loading rates. Source of polluted water was the grey water effluent from the Staff canteen which is located near the constructed wetland. BOD, COD, Nitrate-N, Nitrite-N and Total Phosphorous, turbidity and conductivity were taken to ascertain the water quality. Overall treatment efficiency of the wetland cell is above 75% for all parameters. Regression technique was used to derive the empirical equations. IBM SPSS statistics -20 software was used in analysing the experimental data. The derived equations exhibit a high level of accuracy since predicted data and actual data shared a strong correlation of 79.1% for COD, 93.2% for BOD, 85.1% for Nitrate-N, 84.1% for Nitrite-N and measurements 86.2% for Total Phosphorous. Constructed wetlands in tropic environments capable of using these equations with relevant adjustments to the original. en_US
dc.language.iso en en_US
dc.publisher Department of Earth Resources Engineering en_US
dc.subject BOD en_US
dc.subject COD en_US
dc.subject Nitrate-N en_US
dc.subject Nitrite-N en_US
dc.subject Total phosphate en_US
dc.title Modelling of pollutant removal rates in constructed wetlands under varying hydraulic loading rates en_US
dc.type Conference-Full-text en_US
dc.identifier.faculty Engineering en_US
dc.identifier.department Department of Earth Resources Engineering en_US
dc.identifier.conference 7th National Conference on Earth Resources Management en_US
dc.identifier.place Katubedda en_US
dc.identifier.pgnos pp. 63-67 en_US
dc.identifier.proceeding Proceedings of the 7th National Conference on Earth Resources Management en_US
dc.identifier.email Shiromi27@yahoo.co.uk en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record