Institutional-Repository, University of Moratuwa.  

Preperation of time, bus and crew schedules for a selected passenger transport bus company

Show simple item record

dc.contributor.advisor Kumarage, AS
dc.contributor.author Karunarathna, KAC
dc.date.accessioned 2011-08-05T10:35:00Z
dc.date.available 2011-08-05T10:35:00Z
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/1940
dc.description The Thesis submitted to the Department of Civil Engineering for the MSc in Transportation en_US
dc.description.abstract In Sri Lanka the public transport bus services arc provided jointly by the state sector and the private sector. The state sector has schedules for buses. and crews, but private sector buses are operated by individual operators and the permits are issued to only one selected route. As a result. the passenger transport services are difficult to manage due to the existing ownership structure. As a solution. the National Transport Commission recently introduced the formation or passenger bus companies. In this study, it is assumed that the buses are operated by well organized passenger transport companies. In order to provide reliable and comfortable service to the passengers, the passenger transport companies should consider two important factors buses and crews. These two factors should be scientifically designed in order to provide the best possible service to the passengers at the lowest possible cost. Time tabling is the process of determining how frequently buses must operate on routes based on passenger demand. Bus schedules are process of assigning buses to trips to ensure that the total cost is minimized. Scheduling is carried out by assuming that the start and end time as well as the start and end locations of all trips arc fixed .Crew scheduling is an important problem or a public transport company. since the crew cost arc mostly dominant. Furthermore. this study delivers a comparison between the efficiency of the new system and the previous system using performance indicators.
dc.format.extent viii, 53p. : ill. charts en_US
dc.language.iso en en_US
dc.subject CIVIL ENGINEERING - Thesis
dc.subject TRANSPORTATION - Thesis
dc.subject MOTOR BUS TRANSPORTATION
dc.title Preperation of time, bus and crew schedules for a selected passenger transport bus company
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc en_US
dc.identifier.department Department of Civil Engineering en_US
dc.date.accept 2010-01
dc.identifier.accno 95717 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record