Abstract:
here is a constant increase in demand for electric energy both in industrial and domestic
ectors. Meeting this demand encounters problems associated with construction of new
:ansmission lines not only in urban areas but also in rural areas. In addition to the
viroomental clearance, obtaining of right of way for the power lines is becoming more and
lore difficult. It is therefore much advantageous if the power transmission capacity can be
a creased in the existing transmission lines.//
lit aim of this thesis is to examine the possibilities of using the new types of conductors
ritb higher current carrying capacity in existing transmission lines with capacity restrictions.
Tie replacement of conductors shall improve the line capacity while satisfying the other
orditions such as ground clearance, transmission loss etc. Power interruptions necessary for
he replacement work must be kept as low as possible and in order to achieve this,
ncdifications required for the existing structures shall be minimized. The analysis is done for
'annipiti^a - Ratmalana 132kV transmission line which is critical in transmission network.//
limits of the operation of the new conductor selected for the purpose are demarcated
onsidering the design parameters of the existing line. Also the other components and
tiuctures of the line are checked for their sustain ability for new loads due to the Gap type
onductor and necessary modifications are identified for successful enhancement of the
ansmission capacity.//
By re-conductoring and improving the current carrying capacity of transmission line it
:rovides significant cost savings both in keeping transmission costs down, and differing or
:ven eliminating the need for new transmission line.