Upgrading of Pannipitiya-Ratmalana 132kv transmission line to improve the current carrying capacity

Show simple item record

dc.contributor.advisor Perera, HYR
dc.contributor.advisor Rajamanthri, H
dc.contributor.author Garusinghe, GDNS
dc.date.accessioned 2011-03-30T08:01:19Z
dc.date.available 2011-03-30T08:01:19Z
dc.identifier.citation Garusinghe, G.D.N.S. (2006). Upgrading of Pannipitiya-Ratmalana 132kv transmission line to improve the current carrying capacity [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/696
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/696
dc.description A Dissertation submitted to the Department of Electrical Engineering for the MSc en_US
dc.description.abstract here is a constant increase in demand for electric energy both in industrial and domestic ectors. Meeting this demand encounters problems associated with construction of new :ansmission lines not only in urban areas but also in rural areas. In addition to the viroomental clearance, obtaining of right of way for the power lines is becoming more and lore difficult. It is therefore much advantageous if the power transmission capacity can be a creased in the existing transmission lines.// lit aim of this thesis is to examine the possibilities of using the new types of conductors ritb higher current carrying capacity in existing transmission lines with capacity restrictions. Tie replacement of conductors shall improve the line capacity while satisfying the other orditions such as ground clearance, transmission loss etc. Power interruptions necessary for he replacement work must be kept as low as possible and in order to achieve this, ncdifications required for the existing structures shall be minimized. The analysis is done for 'annipiti^a - Ratmalana 132kV transmission line which is critical in transmission network.// limits of the operation of the new conductor selected for the purpose are demarcated onsidering the design parameters of the existing line. Also the other components and tiuctures of the line are checked for their sustain ability for new loads due to the Gap type onductor and necessary modifications are identified for successful enhancement of the ansmission capacity.// By re-conductoring and improving the current carrying capacity of transmission line it :rovides significant cost savings both in keeping transmission costs down, and differing or :ven eliminating the need for new transmission line.
dc.format.extent viii, 73p. : ill., graphs, tables, en_US
dc.language.iso en en_US
dc.subject THESIS-ELECTRICAL ENGINEERING
dc.subject ELECTRIC ENERGY STORAGE
dc.title Upgrading of Pannipitiya-Ratmalana 132kv transmission line to improve the current carrying capacity
dc.type Thesis-Abstract
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2006-12
dc.identifier.accno 87270 en_US