Selection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations

dc.contributor.advisorLucas, JR
dc.contributor.advisorWijayapala, WDAS
dc.contributor.authorSenanayake, GP
dc.date.accept2010-07
dc.date.accessioned2011-08-04T09:26:29Z
dc.date.available2011-08-04T09:26:29Z
dc.descriptionA dissertation submitted to the Department of Electrical Engineering for the MScen_US
dc.description.abstractAccording to the Long Term Generation Expansion Plan 2009-2022 published by the transmission and Generation Planning Branch of Ceylon electricity Board there will be I our 250MW and I our 300MW coal plant units in Trineomalee area by the year2020. Therefore a necessity Has arisen for identify, plan and formulaic the transmission grid connection for the above mentioned coal fired power plants. Because of the large quantity of power which has to be transmitted from the proposed trineomalee Power Station it has been decided to investigate the possibility of utilizing 400kV as the transmission voltage against the present practice of transmitting power using 220kV. Detailed power system analysis consisting of load flow and stability studies were conducted under night peak and day peak loading conditions to identify areas where the planning criteria were violated using the Power System Simulator for Engineering' (PSS1-) software package. Conclusions of the most feasible transmission network configuration for power plant-grid connection were drawn based on all the above power system analysis results, economic analysis results and other concerns. Saudis were conducted for year 2016 based on the "Long Term Transmission Development Plan 2008-2016* and for year 2020 based on the Master Plan Study on the Development of Power Generation and Transmission System in Sri Lanka -January 2006. It is possible to identify 220kV and 400kV transmission network configurations, which are capable of successfully transmitting 2200MW power generated at trineomalee Power Plant in year 2020. But the 220kV configuration is economically viable with compare to 400kV configuration for trineomalee Power Plant Grid Connection. By considering all the advantages and disadvantages of selected 220kVand 400kV transmission network configurations, it is recommended that 220kVconfiguration be used as the trineomalee Coal Fired Power Plant Grid Connection.
dc.format.extentxii, 65p. : ill.en_US
dc.identifier.accno94844en_US
dc.identifier.citationSenanayake, G.P. (2010). Selection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/1939
dc.identifier.degreeMScen_US
dc.identifier.departmentDepartment of Electrical Engineeringen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/1939
dc.language.isoenen_US
dc.subjectELECTRICAL ENGINEERING - Dissertation
dc.subjectELECTRIC POWER TRANSMISSION
dc.subjectELECTRIC POWER SYSTEMS - Analysis
dc.titleSelection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations
dc.typeThesis-Full-text

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: