Strategies to manage the implementation challenges of public sector design & build contracts in Sri Lanka

dc.contributor.advisorPerera, K
dc.contributor.authorSiriwardana, HDTK
dc.date.accept2023
dc.date.accessioned2024-08-13T08:52:10Z
dc.date.available2024-08-13T08:52:10Z
dc.date.issued2023
dc.description.abstract“Design and build” is a procurement strategy in which the main contractor is appointed based on the Employer’s requirements and as per the principle design by Employer’s principle advisor. Contractor needs to perform both design and construction of a particular Construction project. Design & Build procurement method has several advantages, but the standard of service experienced by Employers during the implementation stage of D&B projects has been found to be less than satisfactory. This “Applied research study” investigates the challenges faced by the public sector construction industry in Sri Lanka. when implementing D&B projects; and it also investigate as to how mitigation measures help to face successfully for these challenges. The preliminary survey conducted to find out various ongoing/recently completed government sector D&B projects and contact details of professionals engaged with those projects to take part as questionnaire respondents. Types of current D&B practices related information also gathered through preliminary survey. Factors affecting for the selection decision of procurement method and various D&B challenges were identified through literature review. Accordingly, the questionnaire survey was developed using the information gathered through preliminary survey and literature review. Through the study it was found that the 72.5% of procurement decisions were based on purposeful reasons such as need of single point of responsibility, requirement of specialized knowledge, being cost driven projects, need of variety of innovative designs. When considering the satisfaction level of respondents, research found that 67.5% of the employers have successfully identified the real necessity of incorporating D&B method to their projects out of other procurement methods. However, the rest of the respondents, stated that it would have been much more successful under traditional procurement method. Research found extreme D&B challenges as limited pool of qualified D&B contractors, Project delay, cost overrun, difficulty in tender evaluation and variation valuation. As per expert view those can be mitigated mainly by setting up practical milestones, using change control mechanisms, proper planning, and monitoring, clearly defining the scope etc.en_US
dc.identifier.accnoTH5326en_US
dc.identifier.citationSiriwardana, H.D.T.K. (2023). Strategies to manage the implementation challenges of public sector design & build contracts in Sri Lanka [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.uom.lk/handle/123/22668
dc.identifier.degreeMSc in Project Managementen_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/22668
dc.language.isoenen_US
dc.subjectDESIGN AND BUILDen_US
dc.subjectPROCUREMENTen_US
dc.subjectCHALLENGESen_US
dc.subjectSTRATEGIESen_US
dc.subjectBUILDING ECONOMICS - Dissertationen_US
dc.subjectPROJECT MANAGEMENT - Dissertationen_US
dc.titleStrategies to manage the implementation challenges of public sector design & build contracts in Sri Lankaen_US
dc.typeThesis-Abstracten_US