84 REFERENCES LIST Abdul-Malak, M. A. U., El-Saadi M.M.H., Abou-Zeid, M.G. (2002). Process model for administrating construction claims. Journal of Management in Engineering 18(2), 84–94. Abdulnabi, H. M., & Agarwal, V. C. (2016). Claims in construction projects "Design errors and change orders". International Journal of Civil Engineering and Technology, 7(6), 2016, 123 – 130. Retrieved from: http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=7&IType =6 Adewunmi, C. A., Odesola, I., & Ugochukwu, S. (2019), Appraising the state of procurement of mechanical and electrical services on selected public building projects in Delta state Nigeria. Retrieved from: https://www.researchgate.net/publication/339777777_APPRAISING_THE_ STATE_OF_PROCUREMENT_OF_MECHNICAL_AND_ELECTRICAL_ SERVICES_ON_SELECTED_PUBLIC_BUILDING_PROJECTS_IN_DEL TA_STATE_NIGERIA Aibinu A.A. (2006). The relationship between distribution of control, fairness, and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), 45–54. Aibinu, A. A., Ling, F. Y. Y., & Ofori, G. (2011). Structural equation modelling of organizational justice and cooperative behavior in the construction project claims process: contractor’s perspectives. Construction Management and Economics, 29(5), 463–481. Alloh, K.O. (2014). Investigating of factors causes’ claims creation in construction projects in the Gaza strip- Palestine (Master’s thesis, The Islamic University -Gaza). Retrieved from: http://library.iugaza.edu.ps/thesis/112889.pdf. Amr, A. G., Hassanein, & Nemr, W. E. (2008). Claims management in the Egyptian industrial construction sector: a contractor's perspective, Journal of Engineering, Construction and Architectural Management, 15(5), 456 – 469 85 Arditi, David, Pattanakitchamroon, Thanat, (2006). Selecting a delay analysis method in resolving construction claims, International Journal of Project Management, 24(2), 145-155. doi: 10.1016/j.ijproman.2005.08.005 Arias, R. P. (2015). Mechanical, Electrical and Plumbing systems in construction management: A literature review of existing MEP textbooks. Retrieved from: https://www.asee.org/public/conferences/56/papers/11565/download Badenfelt, U. (2011). Fixing the contract after the contract is fixed: A study of incomplete contracts in IT and construction projects. International Journal of Project Management, 29(2011), 568–576. Retrieved from: file:///C:/Users/Toshiba/Downloads/badenfelt2011.pdf Baduge, S. & Jayasena H. S. (2012). Application of concurrency in delay claims. In Proceedings of the World Construction Conference (pp. 69-78), Retrieved from: http://docs.suranga.net/publications/2012_concurrent_delays.pdf Bakharya, N.Z., Adnan, H., Ibrahimc, A. (2015) A study of construction claim management problems in Malaysia, Procedia Economics and Finance, 23(2015 ), 63 – 70. doi: 10.1016/S2212-5671(15)00327-5 Banwo, O., Parker, K., Sagoo, A. (2015). Principles of contract claims management – a review of the Nigerian construction industry. In Proceedings of the International Conference on Industrial Engineering and Operations Management (IEOM), (pp. 1–9). doi: 10.1109/IEOM.2015.7093726 Blaxter, L., Hughes, C., and Tight, M., (2008), How to research (3rd ed.), England: Open University Press Claim (2018), Business Dictionary.com. Retrieved from: http://www.businessdictionary.com/definition/claim.html (December 31, 2018) Cambridge business English dictionary. (2011). Cambridge: Cambridge University Press. Retrieved from: https://dictionary.cambridge.org/dictionary/english/record-keeping Carmichael, D. G. (2009). Comments on delay analysis methods in resolving construction claims, International Journal of Construction Management, 9(1), 1-12. doi: 10.1080/15623599.2009.10773118 86 Carmichel, S., Murry, M. (2006). Record keeping for contemporaneous delay analysis: a model for effective event management, Construction Management and Economics, 24, 1007–1018, Retrieved from: http://criticalpath- uae.com/wp- content/uploads/2010/04/Record+Keeping+for+Delay+Analysis.pdf. Castell, M. (2007). Management of change within construction contracts, Retrieved from: http://fidic.org/sites/default/files/6%20Management%20of%20Change%20w ithin%20construction%20contracts.pdf Chappel, D. (2011). Building contract claims (5th ed.). West Sussex: Wiley- Blackwell. Chappel, D., Powell-Smith, V., & Sims, J. (2005), Building contract claims (4th ed.). Retrieved from https://www.blackwellpublishing.com/content/BPL_Images/Content_Store/ WWW_Content/9781405117630/145011763X.pdf Chester, M., & Hendrickson, C. (2005). Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), 102-107. doi: 10.1061/(ASCE)0733- 9364(2005)131:1(102) Chovichien, V., & Tochaiwat, K. (2006). A Survey of construction claims and claim management process in Thailand. Retrieved from: ttps://www.researchgate.net/publication/233400972_A_SURVEY_OF_CON STRUCTION_CLAIMS_AND_CLAIM_MANAGEMENT_PROCESS_IN_ THAILAND. China, L. S., & Hamida, A. R. A. (2015). The practice of time management on construction project, Procedia Engineering, 125, 32-39. doi:10.1016/j.proeng.2015.11.006 Coltman, T., Bru K., Perm-Ajchariyawong, N., Devinney, & Benito, G. T. (2009). Supply chain contract evolution. European Management Journal, 27(6), 388– 401. doi: 10.1016/j.emj.2008.11.005 87 Construction Manual (2010), Volume 1 contract administration, Retrieved from: http://www.ct.gov/dot/lib/dot/documents/dconstruction/construction_manual/ 1-3_project_documentation.pdf Contract administration construction manual (2013), Project recordkeeping and documentation, Retrieved from: https://www.ct.gov/dot/lib/dot/documents/dconstruction/construction_manua l/constmanual_ver2_3_chap_1-3_project_documentation.pdf. Corbett & Co International Construction Lawyers Ltd, (2016), Clause 11, Retrieved from: www.corbett.co.uk › wp-content › uploads › Clause-11 Cunningham.T (2017), What causes cost overruns on building projects? - an overview. Retrieved from: https://arrow.tudublin.ie/cgi/viewcontent.cgi?article=1070&context=beschre oth Cushman, R. F., Carter, J. D., Gorman, P. J., & Coppi, D. F. ( 2001). Construction disputes: representing the contractor, New York: Aspen Publishers Data .J (2012). How do you define a good claims management system, Retrieved from: https://jdidata.com/blog/how-do-you-define-a-good-claims-management- system Demirel, H ¸C., Leendertse, W., Volker, L., Hertogh, M. (2016). Flexibility in PPP contracts – dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), 196- 206, doi:10.1080/01446193.2016.1241414 Denscombe, M. (2008), The good research guide (3rd ed.), England: Open University Press Dolage, D. A. R. & Pathmarajah, T. (2015). Mitigation of delays attributable to the contractors in the construction industry of Sri Lanka -consultants’ perspective, ENGINEER, XLVIII (01), 21-30. Ekhator, O. J. (2016). Investigating causes of disputes in building construction projects in Nigeira, International Journal of Science, Environment, 5( 5), 3583 – 3595. 88 Enshassi, A., Choudhry, R. M., & El-Ghandour, S. (2009). Contractors’ perception towards causes of claims in construction projects. The International Journal of Construction Management, 9(1), 79–92. Fenn, P., Lowe, D., & Speck, C. (1997). Conflict and dispute in construction. Construction Management and Economics, 15(6), 513–518. FIDIC. (1999) Conditions of contract - building and engineering works designed by the employer. (1st ed.). Geneva: International Federation of Consultant Engineer. Gilliss, D. D., Kahn, B. W., Loewke, M., McLaughin, L. P., & Thomas, G. (2016). Mechanical Electrical Plumbing (MEP) trades-divisions 15 and 16, Retrieved from: https://www.briglialaw.com/wp- content/uploads/sites/97/2018/07/Plenary-6-MEP-Paper-for-2016-ABA- Midwinter-Meeting-FINAL.pdf Gulf News (2018), What is a defect liability period?, Retrieved from https://gulfnews.com/business/property/what-is-a-defect-liability-period- 1.2211186. Hakkus, H., NurSari, S., & Uner, S. (2012), The content analysis of graduate theses written between 2000 and 2010 in the field of chemistry education, Procedia - Social and Behavioral Sciences, 47( 2012 ), 729 – 733. Harmon, K. M. J. (2003). Conflicts between owner and contractors: proposed intervention process. Journal of Management and Engineering. 19(3), 121– 125. Harrell, M. C., & Bradley, M. A. (2009). Data collection methods, semi-structured interviews and focus groups, Retrieved from: https://apps.dtic.mil/dtic/tr/fulltext/u2/a512853.pdf. Hassanein, A. G., & Elnemr, W. (2007). Management of change order claims in the Egyptian industrial construction sector, Journal of Financial Management of Property and Construction, 12(1), 45-60. doi: 10.1108/13664380780001093 Hewitt, A. (2011). Construction claims & responses-effective writting & presentation (2 nd ed.). West Sussex: Willey-Blackwell. 89 Ho, S. P., & Liu, L. Y. (2004). Analytical model for analysing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), 94-104. doi: 10.1061/(ASCE)0733- 9364(2004)130:1(94) IlonaBray, J. D. (2019). New-home defects: holding your builder responsible under a warranty, Retrieved from: https://www.nolo.com/legal-encyclopedia/new- home-defects-builder-responsibility-30211.html. Jayasena, H. S., & Johnson, J. (2013). Frequently challenged determinations of the Engineer in Srilankan construction contracts. In Proceedings of the Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction, (pp 235-243), Retrieved from: http://docs.suranga.net/publications/2013_engineers_determination.pdf Jayasena, S., & Alwis, P. (2011). Disruption claims in Sri Lankan construction industry, Retrieved from: https://www.google.lk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad =rja&uact=8&ved=0ahUKEwjgisqLp77aAhULto8KHae5CUQQFggnMAA &url=https%3A%2F%2Fengineer.sljol.info%2Farticles%2F10.4038%2Feng ineer.v46i3.6780%2Fgalley%2F5279%2Fdownload%2F&usg=AOvVaw18X evEQ7KuN3sBVvZuUcfP Joshi, A., Kale, S., Chandel, S., & Pal, D. K. (2005). Likert scale: explored and explained, Journal of Applied Science and Technology 7(4):396-403, doi: 10.9734/BJAST/2015/14975 Kamble, K. S., & Kambekar, A. R. (2013). Analysis of factors contributing delays and claims in construction projects, Retrieved from: http://www.academia.edu/7710701/ANALYSIS_OF_FACTORS_CONTRIB UTING_DELAYS_AND_CLAIMS_IN_CONSTRUCTION_PROJECTS Keane, P. J., & Caletka, A. F. (2008). Delay analysis in construction contracts (1st ed.). West Sussex: Blackwell Publishing Ltd. Keegan, R, (2014). The continued evolution of construction defect, Retrieved from: https://www.atminsurance.com/wp-content/uploads/2019/10/Const-Defect- White-Paper-CP-8333.pdf 90 Kent/McBride, (2019). Construction defect and accident claims, Retrieved from: https://kentmcbride.com/practice_areas/construction-defect-and-accident- claims. Klwtlaw.com (2019). Plumbing & Electrical, Retrieved from: https://klwtlaw.com/plumbing-and-electrical-defects/ Kolonne, T. (08th December 2017) Seminar on contractual and legal aspects of claims (handout), Organized by Australian Institute of Quantity Surveyors (Sri Lanka branch) Kululanga, G. K., Kuotcha, W., & McCaffer, R. (2001). Construction contractors' claim process framework, Journal of Construction Engineering and Management, 127(4), 309-314. Kumaraswamy, M. M., & Yogeswaran, K. (2003). Substantiation and assessment of claims for extensions of time. International Journal of Project Management, 21(1), 27-38. doi: 10.1016/S0263-7863(01)00052-7 Kurunduwage, S. K. (2016). Overview of disruption claim in road construction industry during last five years- (srilankan experience). Retrieved from http://dl.lib.mrt.ac.lk/bitstream/handle/123/12355/pre-text.pdf?sequence=1 Landon, T., & Khan. A. (2018). Practical tips for handling construction claims and disputes: managing documentary evidence. Retrieved from: http://arbitrationblog.kluwerarbitration.com/2018/09/07/practical-tips-for- handling-construction-claims-and-disputes-managing-documentary- evidence/ Levin, P. (1998). Construction contract claims, changes & dispute resolution, (2nd ed.). New York: ASCE Press. Levitt, R. E. (1987). Expert systems in construction: state, Retrieved from: https://doi.org/10.1061/9780784402764 Lian, L. Y., Hassim, S., Muniandy, R., & Ling. T. M. (2012). The Assessment of applications for extension of time claims in Malaysian construction industry. Retrieved from: http://www.ijetch.org/papers/407-P015.pdf Liyanage, D. (2018). Claim management attributes (study material-handout.), Department of Building Economics -University of Moratuwa-Srilanka. 91 Maduranga, J. A. M., Palamakumbura, A. P. W. M. G. M., & Dissanayake, P. B. G. (2016). Preparation of Extension of Time (EOT) claims and delay analysis techniques used in construction industry. The 7th International Conference on Sustainable Built Environment, Sri Lanka Mbachu, J. (2011). Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry project team’s perceptions of the risks and mitigation measures. Construction Management and Economics. 29(10), 1027–1041. doi: 10.1080/01446193.2011.623708 Metropolitan Engineering, Consulting & Forensics (MECF). (2014).Subrogation of construction defects, fire losses, surety losses, and losses caused by defective Electrical Mechanical and other equipment. Retrieved from: https://sites.google.com/site/metropolitanforensics/subrogation-of- construction-defects-fire-losses-surety-losses-and-losses-caused-by- defective-electrical-mechanical-and-other-misc-equipment Mohsin, M.A., Claim analysis of construction projects in Oman, International Journal on Advanced Science Enginering Information Technology, 2(2), 73- 78. Retrieved from: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.1000.7540&rep=r ep1&type=pdf Naoum, S. G. (2007). Dissertation research and writing for construction student, (2nd ed.). United Kingdom: Elsevier Ltd O’Connor, C. J. (2003). “Presenting a claim”. Retrieved from: http://www.apeg.bc.ca/prodev/business/documents/presentingaclaim.pdf Project diaries-contract administration manual (2011). Retrieved from http://www.dot.state.mn.us/const/tools/docs/sec-390.pdf, (Assessed on 23 May 2019) Proving Up Claims - The proof is in the paper: Record keeping for effective construction claims (2013, August). Under Construction. Retrieved from: http://www.kenrichgroup.com/wp-content/uploads/ProvingUpClaims.pdf. (Assed on 20th May 2019) 92 Ramachandra, T., Rotimi, J. O., & Gunaratne, S. (2014). Reasons for contractors’ delay claims failures in Sri Lanka In: Raiden, A B and Aboagye-Nimo, E (Eds) Procs 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 475-484. Rawlinson, S., & Dedman, A. (2010). Specialist costs: M&E services, Retrieved from: https://www.building.co.uk/data/specialist-costs-mande- services/5001903.article Ren, Z., Anumba, G. J., & Ugwu, O. O. (2001). Construction claims management: towards an agent-based approach, Engineering, Construction and Architectural Management, 8(3), 185-197, do: 10.1108/eb021181 Revay, S. G. (1993). Can construction claims be avoided? Building owners and engineers frequently occurring claims identified, Building Research & Information, 21(1), 56-58. doi: 10.1080/09613219308727256 Salwa, A., Fawzy, & Islam, H. E. A. (2012). Contract administration guidelines for U.S. contractors working under World Bank–funded projects, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(2), 101-110. doi: 10.1061/(ASCE)LA.1943-4170.0000091 Samantha, I. P. (2002). An overview of construction claims: how they raise and how to avoid them, Retrieved from: file:///C:/Users/Toshiba/AppData/Local/Temp/AN_OVERVIEW_OF_CONS TRUCTION_CLAIMS_HOW_T.pdf Saram, S. D., Sirimane, M., Abayaratne, H., and Saram, D. L. & F. D. (2018), Construction and projects in Sri Lanka: overview, Retrieved from: https://uk.practicallaw.thomsonreuters.com/w-017- 6138?transitionType=Default&contextData=(sc.Default)&firstPage=true&bh cp=1 Scl-delay-disruption-protocol-second edition (2017). Retrieved from https://www.fenwickelliott.com/research-insight/annual-review/2017/scl- delay-disruption-protocol-second-edition Scott, S. (1990). Keeping better site records. International Journal of Project Management, 8(4), 243–249. 93 Semple, C., Hartman, F. T., & Jergeas, G. (1994). Construction claims and disputes causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), 785–795. Shadid, M. S. R. (2015). Construction claims management in United Arab Emirates construction industry; Retrieved from: http://i- rep.emu.edu.tr:8080/jspui/bitstream/11129/2189/1/shadidmosab.pdf Sibanyama, G., Muya, M., & Kaliba, C. (2012). An overview of construction claims: a case study of the Zambian construction industry, International Journal of Construction Management, 12(1), 65-81. doi: 10.1080/15623599.2012.10773185 Siddiqi, Khalid, & Hunt, A. (2015). Construction claims: impact of defective construction on long-term facility maintenance costs. (Faculty Publications, Kennesaw State University) Retrieved from: http://digitalcommons.kennesaw.edu/facpubs/3658 Singh, D., & Tiong, L. K. (2005). A fuzzy decision framework for contractor selection, Journal of Construction Engineering and Management, 2005(131), 62-70. doi: https://sci-hub.st/10.1061/(ASCE)0733-9364(2005)131:1(62) Stamatiou, Dimitrios, R. I., Kirytopoulos, Konstantinos, A., Ponis, Stavros, T., Gayialis, Sotiris; Tatsiopoulos, Ilias, (2018). A process reference model for claims management in construction supply chains: the contractors’, International Journal of Construction Management, 1-19, doi:10.1080/15623599.2018.1452100 Stojadinovic, Z. (2018). Claims on construction projects – quantification and prevention, In proceedings of the “Contemporary Construction Practice 2018", (pp. 83-112). Retrieved from: https://www.researchgate.net/publication/325846239_CLAIMS_ON_CONS TRUCTION_PROJECTS-QUANTIFICATION_AND_PREVENTION Sulbaran, T. (2011). Case study: ten document needs for schedule litigation support Retrieved from: http://se.asee.org/proceedings/ASEE2011/Papers/FP2011sul148_159.PDF 94 Sounders .M, Lewis.P, Thornhill.A, (2009), Research methods for business students (5th ed.). England: Pearson Education Limited Tochaiwat, K., & Chovichien, V. (2004). Contractors' construction claims and claim management process, Research and Development Journal 15(4), 66-73. Retrieved from: https://www.researchgate.net/publication/215908277_Contractors%27_Cons truction_Claims_and_Claim_Management_Process_Published_in_Research_ and_Development_Journal_154_66-7 Tulli, M. (2014, September 10). Auditing practices and organizational efficiency in local government authorities: A case study of Tanzania. Journal of Finance and Accounting, 2(4), 100-114. doi:10.12691/jfa-2-4-3 Tweeddale, A. (2016), Clause 11, Retrieved from: http://corbett.co.uk/wp- content/uploads/Clause-11.pdf Vidogah, W. N. I. (1998). Improving the management of claims on construction contracts: consultant's perspective, Construction Management and Economics, 16(3), 363-372. doi: 10.1080/014461998372385 Walltempleton, & Haldrup, (2014). Common types of construction defects, Retrieved from: http://www.walltempleton.com/wp/wp- content/uploads/2014/01/Common-Types-of-Construction-Defects-v12.pdf Wenfang, Z. (2013). Research on the legal claim in large-scale Mechanical and Electrical Engineering in construction project, Applied Mechanics and Materials, 416-417, 1818-1821. doi: 10.4028/www.scientific.net/AMM.416- 417.1818 Williams, T. (2003). Assessing extension of time delays on major projects. International Journal of Project Management, 21, 19-26. Wideman, R. M. (2001). Construction claims identification, communication & record keeping. In proceedings of TUNS/Revay seminar in 1990, Retrieved from: http://www.maxwideman.com/papers/construction/construction.pdf Wood, R. (2006). Building and civil engineering claims. The estates Gazette Limited, London. 95 Yang, S. S., & Xu, J. (2011). Construction claims management of civil engineering. Advanced Materials Research. 243–249, 6348–6351. doi:10.4028/www.scientific.net/AMR.243-249.6348 Yates, J. K., & Epstein, A. (2006). Avoiding and minimizing construction delay claim disputes in relational contracting. Journal of Professional Issues in Engineering Education and Practice, 132(2), 168-179. Yusuf, G. A., Mohamed, S. F., Yusof, Z. M., & Misnan, M. S. (2013). Adoption of standard based pricing method for the procurement of Mechanical and Electrical Engineering services in Malaysia, Retrieved from: http://www.iaeng.org/publication/WCE2013/WCE2013_pp459-464.pdf. Zaneldin, E. (2005). Construction claims in the United Arab Emirates: types, causes, and frequency. In: Khosrowshahi, F (Ed.), 21st Annual ARCOM Conference, 7-9 September 2005, SOAS, University of London. Association of Researchers in Construction Management, 2, 813-22. Zaneldin, E. K. (2006). Construction claims in United Arab Emirates: types, causes, and frequency, International Journal of Project Management, 24(5), 453-459. doi: 10.1016/j.ijproman.2006.02.006 Zhou, & Yi-Hong, T. W. (2012). Study on construction claim for international project based on contract status analysis, Applied Mechanics and Materials, 174-177, 3356-3359. doi: 10.4028/www.scientific.net/AMM.174-177.3356 Zubaida, N. M. (2012). Claims management and substantiation in the United Arab Emirates construction sector. (Masters dissertation, The British University of Dubai), Retrieved from: https://bspace.buid.ac.ae/bitstream/1234/285/1/110159.pdf Zubair, A. M., Zaimi, M., Majid, A., & Mushairry, M. (2006). A systematic approach for monitoring and evaluating the construction project progress. Journal - The Institution of Engineers, Malaysia, 67(3), 26-32. Retrieved from: https://www.researchgate.net/publication/49910415_A_systematic_approach _for_monitoring_and_evaluating_the_construction_project_progress 3D Fold Education center (2016), Contracts management and administration (Based on FIDIC, FIDIC-seminar-presentation_ver-1.0.pdf, Retrieved from: