80 REFERENCE LIST Acharya, N. K., Dai Lee, Y., & Man Im, H. (2006). Conflicting factors in construction projects: Korean perspective. Engineering, construction and architectural management, 13(6), 543-566. Alshawi, M., Goulding, J., Khosrowshahi, F., Lou, E., & Underwood, J. (2008). Strategic positioning of IT in construction, an industry leaders’ perspective. UK: Construct IT for Business, The University of Salford. Ashworth, A. (2012). Contractual procedures in the construction industry. Harlow: Prentice Hall. Associated General Contractors of America. (2005). The contractor’s guide to BIM (1st ed.). Las Vegas, NV: AGC Research Foundation. Baccarini, D. (1996). The concept of project complexity—a review. International Journal of Project Management, 14(4), 201-204. Baiden, B. K., & Price, A. D. (2011). The effect of integration on project delivery team effectiveness. International Journal of Project Management, 29(2), 129-136. Baiden, B. K., Price, A. D., & Dainty, A. R. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1), 13-23. Bakis, N., Kagioglou, M., & Aouad, G. (2006). Evaluating the business benefits of information systems. In 3rd International SCRI Symposium, Salford Centre for Research and Innovation, University of Salford, Salford. Ball, M. (2018, April). Building information modeling for the win: top 11 benefits of bim. Redshift. Retrieved from: https://www.autodesk.com/redshift/building- information-modeling-top-11-benefits-of-bim/ 81 Barrie, D. S., & Paulson, B. C. (1992). Professional construction management: including CM, design-construct, and general contracting. McGraw-Hill Science/Engineering/Math. Barsade, S. G., Ward, A. J., Turner, J. D., & Sonnenfeld, J. A. (2000). To your heart's content: A model of affective diversity in top management teams. Administrative Science Quarterly, 45(4), 802-836. Bazjanac, V. (2006). Virtual building environments (VBE) - Applying information modeling to buildings. Retrieved from: http://repositories.cdlib.org/lbnl/LBNL-56072 Bennett, L. M., & Gadlin, H. (2012). Collaboration and team science: from theory to practice. Journal of Investigative Medicine, 60(5), 768-775. Bíró, S., Botzenhardt, F., & Ferdinand, H. M. (2014). Online surveys vs. online observations: A comparative analysis of online research methods and their impact on brand management. Markenbrand, (2/2014), 49-56. Bristow, D. I., & Vasilopoulos, R. (1995). The new CCDC 2: facilitating dispute resolution of construction projects. Construction Law Journal, 11, 95-95. Brown, S. P., Jones, E., & Leigh, T. W. (2005). The attenuating effect of role overload on relationships linking self-efficacy and goal level to work performance. Journal of Applied Psychology, 90(5), 972. Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31(7), 971-980. Butler Jr, A. G. (1973). Project management: a study in organizational conflict. Academy of Management Journal, 16(1), 84-101. Cakmak, E., & Cakmak, P. I. (2014). An analysis of causes of disputes in the construction industry using analytical network process. Procedia-Social and Behavioral Sciences, 109, 183-187. 82 Chai, D. S., Hwang, S. J., & Joo, B. K. (2017). Transformational leadership and organizational commitment in teams: the mediating roles of shared vision and team-goal commitment. Performance Improvement Quarterly, 30(2), 137-158. Chen, L., & Luo, H. (2014). A BIM-based construction quality management model and its applications. Automation in construction, 46, 64-73. Cherns, A. B., & Bryant, D. T. (1984). Studying the client's role in construction management. Construction management and economics, 2(2), 177-184. Cheung, S. O., & Yiu, T. W. (2006). Are construction disputes inevitable?. IEEE Transactions on Engineering Management, 53(3), 456-470. Cheung, S. O., Suen, H. C., Ng, S. T., & Leung, M. Y. (2004). Convergent views of neutrals and users about alternative dispute resolution. Journal of Management in Engineering, 20(3), 88-96. Cheung, S.O., & Pang, K.H.Y. (2013). Construction claims and disputes: causes and cost/time overruns. Anatomy of Construction Disputes, 139 (1), 15-23. Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943- 7862.0000532 Chien, K. F., Wu, Z. H., & Huang, S. C. (2014). Identifying and assessing critical risk factors for BIM projects: Empirical study. Automation in Construction, 45, 1- 15. Chua, D. K. H., Kog, Y. C., & Loh, P. K. (1999). Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), 142-150. Clarke, A. (1999). A practical use of key success factors to improve the effectiveness of project management. International Journal of Project Management, 17(3), 139-145. Cockburn, A. (2000). Selecting a project's methodology. IEEE software, 17(4), 64-71. 83 Colin, J., Langford, D., & Kennedy, P. (1996). The relationship between construction procurement strategies and construction contract disputes. In Proceedings of the CIB W92 North Meets South, Durban, South Africa, (pp.66–82). Collins (1995) Collins Cobuild English Dictionary. London: Harper Collins. Collins, B.R. (2018, November). Teaching students to disagree productively. Retrieved from https://www.edutopia.org/article/teaching-students-disagree- productively Construction Project Information Committee. (2011). Building information modelling - Drawing is dead - long live modelling. Retrieved from http://www.cpic.org.uk/en/bim/building-information-modelling.cfm. Costa, A. C. (2003). Work team trust and effectiveness. Personnel Review, 32(5), 605- 622. Dainty, A., Moore, D., & Murray, M. (2007). Communication in construction: Theory and practice. UK: Routledge. Diekmann, J. E., & Girard, M. J. (1995). Are contract disputes predictable?. Journal of Construction Engineering and Management, 121(4), 335–363. Diekmann, J., Girard, M. & Abdul-Hadi, N. (1994). Disputes potential index: a study into the predictability of contract disputes, in Construction Industry Institute, Source Document 101. Austin, TX: Univ. Texas. Duy Nguyen, L., Ogunlana, S. O., & Thi Xuan Lan, D. (2004). A study on project success factors in large construction projects in Vietnam. Engineering, Construction and Architectural Management, 11(6), 404-413. Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. New York: Wiley. Eynon, J. (2016). Construction manager's BIM handbook. John Wiley & Sons. 84 Fawzy, S. A., & El-Adaway, I. H. (2011). Contract administration guidelines for managing conflicts, claims, and disputes under World Bank–funded projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 4(4), 101-110. Fenn, P., Lowe, D., & Speck, C. (1997). Conflict and dispute in construction. Construction Management & Economics, 15(6), 513-518. Forester, G. L., Thorns, P., & Pinto, J. K. (2007). Importance of goal setting in virtual project teams. Psychological Reports, 100(1), 270-274. Gamero, N., González‐Romá, V., & Peiró, J. M. (2008). The influence of intra‐team conflict on work teams' affective climate: A longitudinal study. Journal of Occupational and Organizational psychology, 81(1), 47-69. Ganah, A. A., & John, G. A. (2014). Achieving Level 2 BIM by 2016 in the UK. In Proceedings of Computing in Civil and Building Engineering (2014) (pp. 143-150). Garcia-Prieto, P., Bellard, E., & Schneider, SC (2003). Experiencing diversity, conflict, and emotions in teams. Applied Psychology, 52 (3), 413-440. Gardiner, P. D., & Simmons, J. E. L. (1998). Conflict in small-and medium-sized projects: Case of partnering to the rescue. Journal of Management in Engineering, 14(1), 35-40. Gill, P., Stewart, K., Treasure, E. & Chadwick, B. (2008). Methods of data collection in qualitative research: interviews and focus groups. British Dental Journal, 204, 291-295. Greenberg, S. (2011, December). The eight causes of disagreement. Optimize Everything. Retrieved from https://www.spencergreenberg.com/2011/12/the- seven-causes-of-disagreement/ Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988-999. 85 Guthrie, J., Petty, R., Yongvanich, K., & Ricceri, F. (2004). Using content analysis as a research method to inquire into intellectual capital reporting. Journal of Intellectual Capital, 5(2), 282-293. Hatush, Z., & Skitmore, M. (1998). Contractor selection using multicriteria utility theory: an additive model. Building and Environment, 33(2-3), 105-115. Hellard, R. B. (1987). Managing Construction Conflict. Harlow, U.K: Longman Scientific Tech. Holton, J. A. (2001). Building trust and collaboration in a virtual team. Team Performance Management: An International Journal, 7(3/4), 36-47. Horwitz, S. K., & Horwitz, I. B. (2007). The effects of team diversity on team outcomes: A meta-analytic review of team demography. Journal of management, 33(6), 987-1015. Hung, W. (2013). Team-based complex problem solving: a collective cognition perspective. Educational Technology Research and Development, 61(3), 365- 384. Hyrkäs, K., & Appelqvist-Schmidlechner, K. (2003). Team supervision in multi professional teams: team members' descriptions of the effects as highlighted by group interviews. Journal of Clinical Nursing, 12(2), 188-197 Im, E. O., & Chee, W. (2012). Practical guidelines for qualitative research using online forums. Computers, informatics, nursing: CIN, 30(11), 604, Retrieved from https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3727223/ Inkpen, A. C., & Tsang, E. W. (2005). Social capital, networks, and knowledge transfer. Academy of Management Review, 30(1), 146-165. Ismail, N. A. A., Chiozzi, M., & Drogemuller, R. (2017). An overview of BIM uptake in Asian developing countries. In Proceedings of AIP Conference. (p. 080008). Ito, K. (1998). U.S. Patent No. 5,761,674. Washington, DC: U.S. Patent and Trademark Office. 86 Johnson, D. W., & Johnson, F. P. (1991). Joining together: Group theory and group skills. Englewood Cliffs, NJ: Prentice Hall. Johnson, D. W., & Johnson, R. T. (1999). Learning Together and Alone: Cooperative, competitive, and individualistic learning (5th ed.). Needham Heights, Massachusetts: Allyn and Bacon. Kang, S. C., Morris, S. S., & Snell, S. A. (2007). Relational archetypes, organizational learning, and value creation: Extending the human resource architecture. Academy of Management Review, 32(1), 236-256. Khemlani, L., Papamichael, K., and Harfmann, A. (2006). The potential of digital building modeling. Retrieved from: http://www.aia.org/SiteObjects/files/potentialofdigital.pdf Knabb, M. T. (2000). Discovering teamwork: A novel cooperative learning activity to encourage group interdependence. The American Biology Teacher, 211-213. Kobolt, A., & Zizak, A. (2007). Teamwork and supervision of teams / teamwork and team supervision. Study Center for Social Work. Chronicle, 14 (2), 367-387. Kraemer, L.K. (2002). Survey research methodology in management information systems: an assessment: Working paper on graduation of management of school, University of California, California. Kumar, C. R. (2008). Research methodology. New-Delhi: APH Publishing Corporation. Kumaraswamy, M. M. (1997). Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), 95-111. Kymmell, W. (2007). Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations (McGraw-Hill Construction Series): Planning and Managing Construction Projects with 4D CAD and Simulations. New York: McGraw Hill Professional. 87 Langford, D. A., Kennedy, P., & Sommerville, J. (1992). Contingency management of conflict: analysis of contract interfaces. Construction Conflict Management and Resolution, 63. Latham, M. (1994). Constructing the team: final report of the government/industry review of procurement and contractual arrangements in the UK construction industry. London: HMSO. Lawrence, P. R., & Lorsch, J. W. (1967). Differentiation and integration in complex organizations. Administrative Science Quarterly, 1-47. Leavy, P., Hesse-Biber, S.N. (Eds.). (2010). Handbook of emergent methods. New York: The Guilford Press. Llpis, G. (2013, November). The 4 most effective ways leaders solve problems. Retrieved from https://www.forbes.com/sites/glennllopis/2013/11/04/the-4- most-effective-ways-leaders-solve-problems/#57ff646c4f97 Locke, E. A., & Latham, G. P. (2006). New directions in goal-setting theory. Current Directions in Psychological Science, 15(5), 265-268. Loosemore, M., Nguyen, B. T., & Denis, N. (2000). An investigation into the merits of encouraging conflict in the construction industry. Construction Management & Economics, 18(4), 447-456. Love, P., Davis, P., London, K., & Jasper, T. (2008). Causal modelling of construction disputes. In Proceedings of the 24th Annual Conference of ARCOM (Association of Researchers in Construction Management), (pp. 869–878). Retrieved from https://espace.curtin.edu.au/bitstream/handle/20.500.11937/19563/164604_16 4604-164604.pdf?sequence=2 Markaki, E. N., Sakas, D. P., & Chadjipantelis, T. (2012). Selecting the project teams’ members. A challenging human resources management process for laboratory research. Key Engineering Materials, 495, (159-162). 88 Marzooq, A.K.S. (2015). The dispute in the construction industry in the Kingdom of Bahrain with a view to developing a dispute mitigation strategy. (Master’s thesis, University of Salford). Retrieved from: https://www.policemc.gov.bh/mcms-store/pdf/45c179cc-345c-4332-a444- b688cb776218_The_Final_Dissertation_FATIMA.pdf Maurer, I. (2010). How to build trust in inter-organizational projects: The impact of project staffing and project rewards on the formation of trust, knowledge acquisition and product innovation. International Journal of Project Management, 28(7), 629-637. Merna, T., & Bower, D. (1997). Dispute resolution in construction & infrastructure projects. Hong Kong: Asia Law & Practice Publishing Limited. Merrills, J. G. (2017). International dispute settlement (6th ed.). New York: Cambridge University Press. Mitkus, S., & Mitkus, T. (2014). Causes of conflicts in a construction industry: A communicational approach. Procedia-Social and Behavioral Sciences, 110, 777-786. Mitropoulos, P., & Howell, G. (2001). Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering And Management, 127(3), 223-231. Mohsini, R. A., & Davidson, C. H. (1992). Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), 343-359. Moore, D. R., & Dainty, A. R. (2001). Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change. Construction Management & Economics, 19(6), 559-562. Nanus, B. (1996). Leading the vision team. The Futurist, 30(3), 20. Nelson, M. (1995). Interpersonal team leadership skills. Hospital Material Management Quarterly, 16(4), 53 – 63. 89 Noor, K.B.M. (2008). Case study: a strategic research methodology. American Journal of Applied Sciences, 5 (11), 1602-1604. Odusami, K. T., Iyagba, R. R. O., & Omirin, M. M. (2003). The relationship between project leadership, team composition and construction project performance in Nigeria. International Journal of Project Management, 21(7), 519-527. Owens (2017, April 13). How to learn the art of productive disagreement [Web log post]. Retrieved from https://www.typefinder.com/blog/how-learn-art- productive-disagreement Project Management Institute. (2004). A guide to the project management body of knowledge (PMBOK Guide) (3rd ed). Newtown Square (PA): Project Management Institute. Punch, K.F. (2005). Introduction to social research: Quantitative and qualitative approaches (2nd ed.). London: Sage publications Ltd. Rahim, M. A. (1983). A measure of styles of handling interpersonal conflict. Academy of Management Journal, 26(2), 368-376. Rameezdeen, R., & Gunarathna, N. (2003). Disputes and construction industry cultures. AACE International Transactions. 241–248 Rauzana, A. (2016). Causes of Conflicts and Disputes in Construction Projects, IOSR Journal of Mechanical and Civil Engineering, 13(5), 44-48. Reina, D., Reina, M., & Hudnut, D. (2017). Why trust is critical to team success. Center for Creative Leadership. Retrieved from https://www.collectiveiq.net/files/why-trust-is-critical-team-success-research- report.pdf Robertson, I., Gratton, L., & Sharpley, D. (1987). The psychometric properties and design of managerial assessment centres: Dimensions into exercises won't go. Journal of Occupational Psychology, 60(3), 187-195. 90 Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1),94-111. Saunders, M., Lewis, P. & Thornhill, A. (2016). Research methods for business students (7th ed.). Italy: Pearson Education Limited. Schuler, H., & Funke, U. (1989). The interview as a multimodal procedure. Newbury Park, CA: Sage. Sekaran, U. (2003). Research methods for business: A skill building approach (4th ed.). Hoboken, NJ: John Wiley and Sons. Semple, C., Hartman, F.T. & Jergeas, G. (1994). Construction claims and disputes: causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), 785-795. Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(1994)120:4(785) Shapiro, E. D. (2012, November). Controlling your company’s disputes: from walking away to taking it all the way. Much. Retrieved from https://www.muchlaw.com/insights/article/controlling-your-companys- disputes-walking-away-taking-it-all-way Sheremata, W. A. (2000). Centrifugal and centripetal forces in radical new product development under time pressure. Academy of Management Review, 25(2), 389-408. Shockley-Zalabak, P., Ellis, K., & Winograd, G. (2000). Organizational trust: What it means, why it matters. Organization Development Journal, 18(4), 35. Sikes, B., Gulbro, R. D., & Shonesy, L. (2010). Conflict in work teams: problems and solutions. In Proceedings of Allied Academies International Conference. Academy of Organizational Culture, Communications and Conflict, (p.15). Jordan Whitney Enterprises, Inc. Singh, D., & Tiong, R. L. (2005). A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), 62- 70. 91 Sinha, M., & Wayal, A. S. (2007). Dispute causation in construction projects. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE). Retrieved from http://www.iosrjournals.org/iosr-jmce/papers/sicete(civil)-volume1/13.pdf Smith, N. J., Merna, T., & Jobling, P. (2014). Managing risk in construction projects. USA: John Wiley & Sons. Spittler, J. R., & Jentzen, G. H. (1992). Dispute resolution: Managing construction conflict with step negotiations. In Proceedings of AACE International Transactions. Retrieved from https://search.proquest.com/openview/5d7d9561fbf093d0ff5ac6afdbe739c0/1 ?pq-origsite=gscholar&cbl=27161 Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665-674. Tarricone, P. & Luca, J. (2002). Successful teamwork: A case study. Higher Education Research and Development Society of Australasia, 640-646. The Landscape Institute. (2016). BIM for landscape. NY: Routledge. Tolson, S. (2013, July). Disputes in the construction industry. Legal Focus. Retrieved from:https://www.fenwickelliott.com//sites/default/files/simon_tolson_- _qanda_for_lawyer_monthly.pdf Topcu, Y. (2004). A decision model proposal for construction contractor selection in Turkey. Building and Environment, 39(4), 469-481. Townly, B. (1994). Communicating with employees. Oxford: Blackwell. Vaaland, T. I. (2004). Improving project collaboration: start with the conflicts. International Journal of Project Management, 22(6), 447-454. Walton, R. E., & Dutton, J. M. (1969). The management of interdepartmental conflict: A model and review. Administrative Science Quarterly, 14(1), 73-84. 92 Wang, X., & Huang, J. (2006). The relationships between key stakeholders’ project performance and project success: Perceptions of Chinese construction supervising engineers. International Journal of Project Management, 24(3), 253-260. Westbrook, L. (1994). Qualitative research methods: A review of major stages, data analysis techniques, and quality controls. Library & Information Science Research, 16(3), 241-254. Wood, R., & Payne, T. (1998). Competency-based recruitment and selection. USA: Wiley. Yan, H., & Demian, P. (2008). Benefits and barriers of building information modelling. Retrieved from t http://homepages.lboro.ac.uk/cvpd2/PDFs/294_Benefits%20and%20Barriers % 20of%20Building%20Information%20Modelling.pdf 2 Yates, J. K., & Epstein, A. (2006). Avoiding and minimizing construction delay claim disputes in relational contracting. Journal of Professional Issues in Engineering Education and Practice, 132(2), 168-179. Yemm, G. (2012). FT essential guide to leading your team: How to set goals, measure performance and reward talent. UK: Pearson. Yin, R.K. (2003). Case study research: design and methods (3rd ed.). California: Sage publications Inc. Younis, G., Wood, G., & Malak, M. A. A. (2008). Minimizing construction disputes: the relationship between risk allocation and behavioural attitudes. In Proceedings of on Building Education & Research BEAR CIB International Conference, (pp.728-740). Zack, J.G. (1995). Practical dispute management. Cost Engineering, 37(12), 55. Zuppa, D., Issa, R. R., & Suermann, P. C. (2009). BIM’s impact on the success measures of construction projects. Computing in Civil Engineering, 503-512.