REFERENCES References References 1. Alhazmi, T. and Mccaffer, R., 2000. Project procurement systems selection model. Journal of Construction Engineering and Management, 126(3), 176 - 183. 2. Ashworth, A. and Hogg, K., 2002. Willis's practice and procedure for the quantity surveyor. 11 t h ed. united Kingdom: Blackwell Science Ltd. 3. Ashworth, A., 1996. Contractual procedures in the construction industry. 3 r d ed. England: Wesley Longman Ltd. 4. Ashworth, A., 2002. Pre-contracts studies. 2 n d ed. London: Blackwell science Ltd. 5. Bagnall et al, 1990. Tenders and contracts for building. 3 r d ed. United Kingdom: Blackwell science Ltd. 6. Brandon, P., 1999. Quantity surveying techniques; new direction. London: Blackwell science Ltd. 7. Cartlidge, D. , 2002. New aspects of quantity surveying practice. Britain: MPG book Ltd. 8. Chan, A.P.C., Yung, K.H.E., Lam, P.T.I., Tarn, C M . and Chueng, S.O. 2001. Application of Delhi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(3), 699- 718. 9. Chang, C.Y., and Ive, G., 2002. Rethinking the multi-attribute utility approach based procurement route selection technique, Construction Management and Economics, 20(6), 275-284 . Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 74 References 10. Chege, L.W. and Rwelamila, P.D., 2000. Risk management and procurement systems- an imperative approach. Department of Construction Management and Economics, University of Cape Town. 11. Cheung, U., Lam T.I., Leung, M.Y. and Wangwan, Y., 2001. Analytical hierarchy process based procurement selection method, Construction Management and Economics, 19(5), 427 - 437. 12. Davidson, C , H., Johnson, C , Lizarralde, G., Dikmen, N., and Sliwinski, A., 2007. Truths and myths about community participation in post disaster housing projects, Habitat International, 31 , 100 - 115. 13. Fellows, R. and Liu, A., 2003. Research methods for construction. 2nd ed. oxford: Blackwell publishing. 14. Franky, W.H. Wong, Patrick, T.I., Lam and Chan, P.C. 2003. Procurement approaches to achieve better constructability. International conference on building and real estate, The Hong Kong Polytechnic University, Hung Horn, Kowloon, Hong Kong. 15. Gamage, I.S., 2005. Factors affecting construction procurement selection: study of clients' requirements and project characteristics. Dissertation, (BSc). University of Moratuwa. 16. Gunasiri, S. S., 1997. The effective of construction procurement methods on project performance. Dissertation, (BSc). University of Moratuwa. 17. Griffith A. and Phillips A, 2001. The influence of the construction design and Management) Regulations 1994 upon the procurement and management of small building works, Construction Management and Economics, 19(9), 533 - 540. 18. Harris, F. and Mccaffer, R., 2001. Modern construction management. 5 t h ed. United Kingdom: Blackwell science Ltd. 19. Hashim, M, Yuet, M.C, Yin N.C, Hooi N.S, Heng S.M. and Lee Yong T.L., 2006. Factors influencing the selection of procurement systems by clients. Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 75 References International Conference on Construction Industry, 21st June - 25th June 2006 Padang, Indonesia. 20. Jayasena, H.A.E.C., 2009. Factors affecting construction procurement selection: study of public sector vs private sector. Dissertation, (BSc). University of Moratuwa. 21. Kelly, J., Morledge, R. and Wilkinson, S., 2002. Best value in construction. London: Blackwell Science Ltd. 22. Kraemer, L.K. 2002. Survey research methodology in management information systems: an assessment. Working paper on graduation of management of school, University of California, California. 23. Kumaraswamy, M. and Dissanayaka, M., 1998. Linking procurement systems to project priorities, Building Research & Information, 26:4, 223 -238. 24. Kumaraswamy, M.M., 1998. Proactive procurement protocols for construction projects. 62-74. 25. Legendre P., 2005. Species Associations: The Kendall Coefficient of Concordance Revisited, Journal of Agricultural, Biological and Environmental statistics, 10(2), 226-245. 26. Love, P.E.D., Earl, G. and Skitmore, M., 1996. Selecting a suitable procurement method for building projects. Construction management and economics, 16(1), 221-233. 27. Longford, D. and Male, S., 2001. Strategic management in construction. 2 n d ed. United Kingdom: Blackwell science Ltd. 28. Luu, D.T., Thomas, S. and Chen S.E., 2003. Parameters governing the selection of procurement system-an empirical survey. Engineering, Construction and Architectural Management, 10(3), 209-218. Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 76 References 29. Makhanu, K.S., Waswa G.W., and Masinde G.W. 2006. Model post disaster reconstruction in third world countries, (Case of El Nino emergency project - Kenya). Kenya: Center for Disaster. Management and Humanitarian Assistance. 30. Kelvin, Z., Wilkinson, S., Masurier, J.L. and Van der Zon, J., 2006. Reconstruction procurement systems: The 2005 Matata flood Reconstruction Experience. N e w Zealand: University of Auckland. 31. Masterman, J.W.E., 1992. An introduction to building procurement systems. London: E & FN Spon. 32. Masurier, J.L., Rotimi, O.B.J., and Wilkinson, S., 2006. The regulatory framework for effective post disaster reconstruction in N e w Zealand. In: Third th International Conference on Post Disaster Reconstruction in New Zealand, 17 May -18th May 2006, Italy. 33. Masurier, J.L., Rotimi, J.O.B., and Wilkinson, S. 2007. A comparison between routine constriction and post disaster reconstruction with case studies from N e w Zealand. In: Current advances in construction management research conference of the Association of Researchers in Construction Management, 4th September - 6th September 2007, Birmingham. 34. Masurier, J.L., Seville, E., and Wilkinson, S., 2006. Barriers to Post Disaster Reconstruction. In: Resilient Organizations Research Report March 2006, N e w Zealand. 35. Masurier, J.L., Wilkinson, S., and Shestakova, Y., 2006. An analysis of the alliancing procurement method for reconstruction following an earthquake. In: Proceedings of the 8th U.S. National Conference on Earthquake Engineering, 18th April -22nd April 2007, California. 36. Mcdermott, P. and Rowlinson, S., 1999. Procurement systems. A guide to best practice in construction. London: E & FN Spon. 37. Morledge, R. and smith, A., 2004. Building procurement. London: Blackwell science Ltd. Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 11 References 38. Myburgh, D., Seville, E., and Wilkinson, S., 2008. Post Disaster Reconstruction Research in N e w Zealand. In: Resilient Organizations Research Report March 2008, N e w Zealand. 39. Najeeb, A.L., 2005. Factors affecting construction procurement selection: study of external environment. Dissertation, (BSc). University of Moratuwa. 40. Ng, S.T., Luu, D.T. and Skitmore^ M. 2005. Capitalizing Experiential Knowledge for Guiding Construction Procurement Selection. Australian Journal of Construction Economics & Building, 13(3), 112-117. 4 1 . 0 d a m s , A. M. and Uff, J., 1995. Risk management and procurement in construction. London: Centre of construction law and management. 42. Oguniana, S., 1999. Profitable partnering in construction procurement. London: E & FN Spon. 43. Potter, M., 1995. Planning to build?. London: Construction industry research and information association. 44. Potts, K., 1997. Contracts strategies- major construction works; contractual and financial management. 45. Rameezdeen, R and De Silva, S. 2002. Trends in construction procurement systems in Sri Lanka. Built-environment-Sri Lanka, 2(2), 2-9. 46. Rameezdeen, R., and Rathnasabapathy, S. 2006. A multiple decisive factor model for construction procurement system selection. In: E. Sivyer. The construction and building research conference of the Royal Institution of Chartered Surveyors, 7th September -8th September 2006, University College London. Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 78 References 47. Seeley, I. H., 1997. Quantity surveying practice. 2 ed. London: Macmillan press Ltd. 48. Skitmore, R.M., and Marsden, D.E. 1988. 'Which Procurement System? Towards a Universal Procurement Selection Technique". Construction and Management Economics, 6, 71-89. 49. Sutharsan, N., 2001. Building procurement system selection model for private sector client. Dissertation, (BSc). University of Moratuwa. 50. Tan, W., 2002. Practical research method. Singapore: Pearson Education Asia Pvt Ltd. 51. Thayakaran, S., 1997. An investigation of clients' types and their requirements. Dissertation. (BSc). University of Moratuwa. 52. Thomas N.G.S., Luu, D.T., Chen, S.E. and Lam K.C., 2002. Fussy membership functions of procurement selection criteria, Construction management and Economics, 20(2), 285- 296. 53. Turner, A. 1990.Building Procurement, McMillan, UK. 54. Wiehen, M.H., 2000. Transparency in Procurement. The role of bilateral donors in fighting corruption, 25th April -27th April 2000, Maastricht, Netherland. 55. Wipulanayake, P.S., 2004. A review of trend in construction procurement systems: the dominant role of traditional procurement systems in Sri Lankan construction industry. Dissertation, (BSc). University of Moratuwa. Prioritizing Procurement Selection Parameters for Disaster Reconstruction Project 79