Institutional-Repository, University of Moratuwa.  

Selection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations

Show simple item record

dc.contributor.advisor Lucas, JR
dc.contributor.advisor Wijayapala, WDAS
dc.contributor.author Senanayake, GP
dc.date.accessioned 2011-08-04T09:26:29Z
dc.date.available 2011-08-04T09:26:29Z
dc.identifier.citation Senanayake, G.P. (2010). Selection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/1939
dc.identifier.uri http://dl.lib.mrt.ac.lk/handle/123/1939
dc.description A dissertation submitted to the Department of Electrical Engineering for the MSc en_US
dc.description.abstract According to the Long Term Generation Expansion Plan 2009-2022 published by the transmission and Generation Planning Branch of Ceylon electricity Board there will be I our 250MW and I our 300MW coal plant units in Trineomalee area by the year2020. Therefore a necessity Has arisen for identify, plan and formulaic the transmission grid connection for the above mentioned coal fired power plants. Because of the large quantity of power which has to be transmitted from the proposed trineomalee Power Station it has been decided to investigate the possibility of utilizing 400kV as the transmission voltage against the present practice of transmitting power using 220kV. Detailed power system analysis consisting of load flow and stability studies were conducted under night peak and day peak loading conditions to identify areas where the planning criteria were violated using the Power System Simulator for Engineering' (PSS1-) software package. Conclusions of the most feasible transmission network configuration for power plant-grid connection were drawn based on all the above power system analysis results, economic analysis results and other concerns. Saudis were conducted for year 2016 based on the "Long Term Transmission Development Plan 2008-2016* and for year 2020 based on the Master Plan Study on the Development of Power Generation and Transmission System in Sri Lanka -January 2006. It is possible to identify 220kV and 400kV transmission network configurations, which are capable of successfully transmitting 2200MW power generated at trineomalee Power Plant in year 2020. But the 220kV configuration is economically viable with compare to 400kV configuration for trineomalee Power Plant Grid Connection. By considering all the advantages and disadvantages of selected 220kVand 400kV transmission network configurations, it is recommended that 220kVconfiguration be used as the trineomalee Coal Fired Power Plant Grid Connection.
dc.format.extent xii, 65p. : ill. en_US
dc.language.iso en en_US
dc.subject ELECTRICAL ENGINEERING - Dissertation
dc.subject ELECTRIC POWER TRANSMISSION
dc.subject ELECTRIC POWER SYSTEMS - Analysis
dc.title Selection of transmission network configuration for Trincomalee power plant grid connection : technical and financial feasibility study for 220 kV/400kV configurations
dc.type Thesis-Full-text
dc.identifier.faculty Engineering en_US
dc.identifier.degree MSc en_US
dc.identifier.department Department of Electrical Engineering en_US
dc.date.accept 2010-07
dc.identifier.accno 94844 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record