Performance management of contractor’s quantity surveyors through the use of proper documents and records

Show simple item record

dc.contributor.author Nisansala, MK
dc.contributor.author Shandraseharan, A
dc.contributor.author Perera, K
dc.contributor.author Disaratna, V
dc.date.accessioned 2023-06-22T04:39:49Z
dc.date.available 2023-06-22T04:39:49Z
dc.date.issued 2022
dc.identifier.citation Nisansala, M. K., Shandraseharan, A., Perera, K., & Disaratna, V. (2022). Performance management of contractor’s quantity surveyors through the use of proper documents and records. A|Z ITU Journal of The Faculty of Architecture, 19(2), 401-413. https://doi.org/10.5505/itujfa.2022.33603 en_US
dc.identifier.issn 1302-8324(Online) en_US
dc.identifier.uri http://dl.lib.uom.lk/handle/123/21144
dc.description.abstract Errors in construction documents and records can have serious impacts on construction projects. These impacts are manifested mostly during the construction and post-construction stages of the projects. The errors in documents and records significantly affect the performance of quantity surveyors (QSs) working for contractors. Thus, the aim of this study was to investigate how the performance of contractor QSs could be managed using proper documents and records. A mixed approach was used to collect the required empirical data via a series of interviews and a questionnaire survey. The collected data were analysed using manual content analysis and relative important index, respectively. The results of the analysis indicate the documents and records that are significantly relevant to contractor QSs. Similarly, significant errors that can occur in those documents and records and causes of those errors also were identified. Finally, the solutions that could minimize the errors were identified and ranked according to their significance. The study findings revealed that the use of proper documentation and record management can enhance the performance of contractor QSs and ensure project success by controlling cost and time overruns. en_US
dc.language.iso en en_US
dc.publisher Istanbul Teknik Universitesi en_US
dc.subject Causes en_US
dc.subject Contractor QS en_US
dc.subject Documents and records en_US
dc.subject Errors en_US
dc.subject Solutions. en_US
dc.title Performance management of contractor’s quantity surveyors through the use of proper documents and records en_US
dc.type Article-Full-text en_US
dc.identifier.year 2022 en_US
dc.identifier.journal A|Z ITU Journal of the faculty of Architecture en_US
dc.identifier.issue 2 en_US
dc.identifier.volume 19 en_US
dc.identifier.pgnos 401-413 en_US
dc.identifier.doi https://doi.org/10.5505/itujfa.2022.33603 en_US