Service process improvement through VSM of lean six sigma: a case study

dc.contributor.authorWickramasinghe, V
dc.contributor.authorIllankoon, P
dc.date.accessioned2026-01-22T05:33:03Z
dc.date.issued2025
dc.description.abstractThe paper presents a case study where value stream mapping (VSM) is applied to improve factory-floor employees’ performance management process (PMP) in the manufacturing context. The objectives were to 1) understand the PMP of the factory-floor employees, and 2) apply the VSM to improve their PMP. The present study a) identifies value from customers’ perspective, b) maps PMP along with its subprocesses, c) analyses waste with the intention of minimization, d) adopts a pull approach to fulfil customers’ demands, and e) proposes avenues for perfection. The study showed that notable efficiency improvements can be achieved even by SMEs from the application of VSM and DMAIC (define-measure-analyzeimprove-control).
dc.identifier.conferenceMoratuwa Engineering Research Conference 2025
dc.identifier.departmentEngineering Research Unit, University of Moratuwa
dc.identifier.emailorcid.org/0000-0001-9318-9823
dc.identifier.emailorcid.org/0000-0001-8693-3431
dc.identifier.facultyEngineering
dc.identifier.isbn979-8-3315-6724-8
dc.identifier.pgnospp. 25-30
dc.identifier.proceedingProceedings of Moratuwa Engineering Research Conference 2025
dc.identifier.urihttps://dl.lib.uom.lk/handle/123/24773
dc.language.isoen
dc.publisherIEEE
dc.subjectservice process improvement
dc.subjectvalue stream mapping
dc.subjectwaste reduction
dc.titleService process improvement through VSM of lean six sigma: a case study
dc.typeConference-Full-text

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1571141758.pdf
Size:
1.39 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections