Integrating construction schedules and ERP processes

dc.contributor.advisorPerera, AADAJ
dc.contributor.authorSenarathne, GMRY
dc.date.accept2024
dc.date.accessioned2025-06-27T05:10:59Z
dc.date.issued2024
dc.description.abstractConstruction schedule is the key tool for project managers to manage and deliver the project successfully within the time, under the budget and expected quality by utilizing resource. Therefore, viable construction schedule should be prepared during the estimation & planning stage of the project life cycle. During the project execution stage project monitoring should be evaluated thoroughly to get the successful deliverables. During real time scheduling, it should be focused on conflicts such as setting priorities, workload prediction, Time management, Inconsistency of dates, lack of integration, Manual data entry errors. Enterprise Resource Planning Systems (ERP) have replaced the manual construction planning procedure due to significant developments of the digitalization. ERP is a solution that facilitates efficient resource management through the automation of resource planning and real-time activity tracking. ERP systems offer numerous advantages, such as increased efficiency and productivity, it should be needed to integrate with the organization’s system specially in project planning in effective way. The main objective of this research was to develop framework to mitigate challenges of ERP integration with construction schedule. Literature review has identified the integrating challenges such as Complexity of customization and configuration, Cost Overrun, Poor Legacy System Integration, Poor technical tendency, Data Security and Reluctance to change. These factors are identified as core factors of this research. The research was carried out using methods related to quantitative as well as qualitative analysis. A questionnaire survey was carried out for quantitative analysis and data collected through a semi structured interviews were used for qualitative analysis. Further, descriptive statistics were used as the analysing tool. Sri Lankan construction industry is moderately satisfied with current ERP practise but not with the Planning & Scheduling. Ultimately, a framework was developed with suggestions and analysed questionnaire results to mitigate the issues in the above identified areas. Thus, the framework will contribute construction organizations and IT service providers to improve and modify further integrations for a successful ERP system.
dc.identifier.accnoTH5586
dc.identifier.citationSenarathne, G.M.R.Y. (2024). Integrating construction schedules and ERP processes [Master’s theses, University of Moratuwa]. Institutional Repository University of Moratuwa. https://dl.lib.uom.lk/handle/123/23740
dc.identifier.degreeMSc in Construction Project Management
dc.identifier.departmentDepartment of Civil Engineering
dc.identifier.facultyEngineering
dc.identifier.urihttps://dl.lib.uom.lk/handle/123/23740
dc.language.isoen
dc.subjectENTERPRISE RESOURCE PLANNING
dc.subjectCONSTRUCTION INDUSTRY-Scheduling
dc.subjectCONSTRUCTION SCHEDULE
dc.subjectENTERPRISE RESOURCE PLANNING-Integration
dc.subjectCONSTRUCTION INDUSTRY-Sri Lanka
dc.subjectIT INDUSTRY-Sri Lanka-Service Providers
dc.subjectCIVIL ENGINEERING-Dissertation
dc.subjectMSc in Construction Project Management
dc.titleIntegrating construction schedules and ERP processes
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
TH5586-1.pdf
Size:
177.94 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
TH5586-2.pdf
Size:
136.24 KB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
TH5586.pdf
Size:
1.2 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: