Reconstruction vs retrofitting of a bridge for sustainability

dc.contributor.authorDissanayake, PBR
dc.contributor.authorBandara, AMACS
dc.contributor.authorRathnayaka, RMSUP
dc.date.accessioned2013-11-12T19:32:58Z
dc.date.available2013-11-12T19:32:58Z
dc.date.issued2013-11-13
dc.description.abstractBridges face the risk of being damaged by natural and manmade disasters. Old bridges are more vulnerable in such situations. The common practice is removing these damaged bridges and constructing new ones. However, repairing, retrofitting and reusing damaged bridges could be economical and less time consuming and hence more sustainable than building new bridges. There are various methods to assess the possibility of improving old and / or damaged bridges using modern day techniques. This paper is a case study for using one of such assessment procedures on a damaged railway bridge in Puttalam, Sri Lanka. The bridge concerned is 34m long, single spanned, double lattice girded, wrought iron Railway Bridge, which was built about 40 years ago and damaged and displaced from its abutments by floods. The paper discusses the method used to determine the possibility of reusing the bridge by conducting a series of tests on the temporarily erected bridge and using a finite element model. It also presents results of tests carried out after the bridge was repaired and retrofitted. The results show that retrofitting has made substantial improvements to the bridge.en_US
dc.identifier.conferenceInternational Symposium on Advances in Civil and Environment Engineering practices for sustainable developmenten_US
dc.identifier.emailranjith@civil.pdn.ac.lken_US
dc.identifier.pgnos218-224en_US
dc.identifier.placeFaculty of Engineering - University Of Ruhuna. Galleen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/9064
dc.identifier.year2012en_US
dc.language.isoenen_US
dc.subjectTtruss bridgeen_US
dc.subjectCondition assessmenten_US
dc.subjectFinite element modelen_US
dc.subjectValidationen_US
dc.subjectFatigue lifeen_US
dc.subjectRetrofittingen_US
dc.titleReconstruction vs retrofitting of a bridge for sustainabilityen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
31.pdf
Size:
368.72 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: