Exploring cost estimation accuracy and its implications for cost overruns and delays in small-scale construction projects: evidence from Sri Lanka

dc.contributor.authorWadu Mesthrige, J
dc.contributor.authorAbeydeera, LHUW
dc.contributor.authorMaqsood, T
dc.contributor.authorChandani, GGN
dc.contributor.editorWaidyasekara, KGAS
dc.contributor.editorJayasena, HS
dc.contributor.editorChandanie, H
dc.contributor.editorTennakoon, GA
dc.date.accessioned2026-09-30T05:13:44Z
dc.date.issued2026
dc.description.abstractThis study investigates the relationship between cost estimation accuracy and project outcomes, specifically cost overruns and project delays in small-scale construction projects in Sri Lanka. A qualitative research approach was adopted, supported by a descriptive-analytical, cross-sectional design. Data were collected through semi-structured interviews with construction professionals, including contractors, project managers, and quantity surveyors. Thematic analysis was employed to identify key patterns and relationships, while findings were contextualised through a review of relevant literature. The results reveal that cost estimation inaccuracies are widespread and arise from multiple interrelated factors, including incomplete project scope, lack of reliable cost data, limited professional expertise, and significant material price volatility. These inaccuracies were found to have a direct and substantial impact on project performance, with cost overruns commonly ranging between 20–40% and delays frequently extending project timelines. The study also highlights the presence of a “cost-delay spiral,” where financial shortfalls lead to project interruptions, further escalating both time and cost. Additionally, systemic factors such as competitive bidding pressures, client preferences for low estimates, and informal contractual practices contribute to the persistence of estimation inaccuracies. Study concludes that improving cost estimation accuracy requires a holistic approach, including enhanced professional engagement, improved data systems, and stronger contractual frameworks. These improvements are essential for enhancing the reliability and sustainability of small-scale construction projects in Sri Lanka.
dc.identifier.citationWadu Mesthrige, J., Abeydeera, L.H.U.W., Maqsood, T. & Chandani, G.G.N.(2026).Exploring cost estimation accuracy and its implications for cost overruns and delays in small-scale construction projects: evidence from Sri Lanka. In K.G.A.S. Waidyasekara, H.S. Jayasena, P.L.I. Wimalaratne, & G.A. Tennakoon (Eds.), World Construction Symposium – 2026 : 14th World Construction Symposium (pp. 714-728). Department of Building Economics, University of Moratuwa. https://doi.org/10.31705/WCS.2026.53
dc.identifier.conferenceWorld Construction Symposium - 2026
dc.identifier.departmentDepartment of Building Economics
dc.identifier.doihttps://doi.org/10.31705/WCS.2026.53
dc.identifier.emailwadu.jayantha@rmit.edu.au
dc.identifier.emailS3855817@student.rmit.edu.au
dc.identifier.emailtayyab.maqsood@rmit.edu.au
dc.identifier.emailnavodag@uom.lk
dc.identifier.facultyArchitecture
dc.identifier.issn2362-0919
dc.identifier.pgnospp. 714-728
dc.identifier.placeColombo
dc.identifier.proceeding14th World Construction Symposium - 2026
dc.identifier.urihttps://dl.lib.uom.lk/handle/123/25630
dc.language.isoen
dc.publisherDepartment of Building Economics
dc.subjectCOST ESTIMATION ACCURACY
dc.subjectCOST OVERRUNS
dc.subjectPROJECT DELAYS
dc.subjectSMALL-SCALE CONSTRUCTION
dc.subjectSRI LANKA
dc.titleExploring cost estimation accuracy and its implications for cost overruns and delays in small-scale construction projects: evidence from Sri Lanka
dc.typeConference-Full-text

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
053.S18169.pdf
Size:
315.49 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections