Development of a cost based optimization technique for tower line design

dc.contributor.advisorWijayatilake, ACS
dc.contributor.advisorRodrigo, A
dc.contributor.authorRathnayaka, RKAN
dc.date.accept2014
dc.date.accessioned2015-07-06T08:25:26Z
dc.date.available2015-07-06T08:25:26Z
dc.date.issued2015-07-06
dc.description.abstractOverhead high voltage and medium voltage transmission using tower lines is a common practice all over the world. Tower line construction projects integrate high costs while about 25 % of the cost is for tower metallic parts and 30 % of that is for foundation and erection [1]. Developed economies trying to achieve the cost optimization of tower lines by optimum spotting of towers at designing stage and several techniques have been developed in that purpose. In Sri Lanka, the process of planning, design and construction of transmission and medium voltage power lines is solely authoritative by Transmission Licensee and Five Distribution Licensees of the country. Until now, these six licensees and contractual parties, who are involved in power line construction process, do not use any systematic method for cost optimization in line design and construction. As the first step of this study, a research survey was done about available line design techniques, design criteria and constraints and available cost optimization techniques. Data were collected on available structure types, most recent structure costs, foundation costs and erection costs. This report will discuss the Dynamic Programming algorithm which gives the choice of available towers (structure) and sites of the towers for given survey data of a transmission line route, in such a way that the overall cost of running the line from one end of the route to the other, subject to all the design constraints, is a minimum. A software tool was developed which runs based on the developed dynamic programming algorithm. The software tool chooses and sites the towers, given the survey data of a transmission line route, available tower types and conductor parameters. By developed software tool, several experiments and re-designing were done using profile survey data of some constructed and existing 33 kV tower lines under Projects and Heavy Maintenance Branch-Region 01 of Ceylon Electricity Board (CEB) from year 2010. The results were compared with the initial designs and it has shown that a reasonable cost reduction can be achieved, and that cost reduction is varying with total line length, and characteristics of the line route.en_US
dc.identifier.accno107093en_US
dc.identifier.citationRathnayaka, R.K.A.N. (2014). Development of a cost based optimization technique for tower line design [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/10982
dc.identifier.degreeMSc.en_US
dc.identifier.departmentDepartment of Electrical Engineeringen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/10982
dc.language.isoenen_US
dc.subjectELECTRICAL ENGINEERING-Dissertationen_US
dc.subjectPOWER GENERATION-Sri Lanka
dc.titleDevelopment of a cost based optimization technique for tower line designen_US
dc.typeThesis-Abstracten_US

Files