Partnering to bridge the gap between conventional and BIM based project procurement

dc.contributor.authorKahandawa, KARVD
dc.contributor.authorJayasena, HS
dc.contributor.editorSandanayake, YG
dc.contributor.editorFernando, NG
dc.contributor.editorKarunasena, GI
dc.date.accessioned2022-03-04T03:08:40Z
dc.date.available2022-03-04T03:08:40Z
dc.date.issued2015-06
dc.description.abstractBuilding Information Modelling (BIM), has not yet been used in the Sri Lankan context. It has not yet become a clearly identified and proven standard method in building procurement. As a procurement method, Integrated Project Delivery (IPD) is key contender in BIM implementation process worldwide. But due to the lack of integrated projects in Sri Lanka and the reluctance of professional, changing their methods for the sake of BIM would be impractical. Therefore it is vital to identify the minimum requirement needed, to implement BIM. Partnering is a concept that is also alien to the Sri Lankan context; but is more of the intangible procurement method laid on top of the existing procurement system. This method creates the environment that dissolves the contractual boundaries, enabling working together to achieve mutual as well as individual goals. Therefore it could be used to create the collaborative environment needed for BIM, rather than changing the whole system. Through an extensive literature survey, the characteristics of partnering, including its benefits, barriers were identified. Thereafter the applicability of BIM to the current context was recognized. Then it was discovered of CIC BIM protocol to bridge the contractual gap, that would give out the smallest change required for BIM. Thereafter, the applicability of the BIM protocol and barriers that prevents BIM from implementation in the Sri Lankan context was analysed based on interview responses of the professionals. It was also identified that CIC BIM protocol is not covering all the barriers in concern. With the addition of partnering to the equation it was identified that partnering together with the BIM protocol creates the most suitable environment for BIM implementation in the Sri Lankan context.en_US
dc.description.sponsorshipInternational Council for Research and Innovation in Building and Construction (CIB)en_US
dc.identifier.citationKahandawa, K.A.R.V.D., & Jayasena, H.S. (2015). Partnering to bridge the gap between conventional and BIM based project procurement. In Y.G. Sandanayake, N.G. Fernando & G.I. Karunasena (Eds.), Sustainable development in built environment: green growth & innovative directions (pp. 382-390). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2015-Proceedings.pdfen_US
dc.identifier.conference4th World Construction Symposium 2015en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.emailkad2ravindu@gamil.comen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 382-390en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingSustainable development in built environment: green growth & innovative directionsen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17137
dc.identifier.year2015en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Buildersen_US
dc.relation.urihttps://ciobwcs.com/downloads/WCS2015-Proceedings.pdfen_US
dc.subjectBarriersen_US
dc.subjectBuilding information modelling (BIM)en_US
dc.subjectBIM Protocolen_US
dc.subjectCICen_US
dc.subjectConstructionen_US
dc.subjectPartneringen_US
dc.subjectSri Lankaen_US
dc.titlePartnering to bridge the gap between conventional and BIM based project procurementen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
PARTNERING TO BRIDGE THE GAP BETWEEN CONVENTIONAL AND.pdf
Size:
4.68 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections