Evaluation performance of constructors in concrete producing based on cost and quality parameters

dc.contributor.advisorDe Silva L
dc.contributor.authorPathirane, AL
dc.date.accept2010
dc.date.accessioned2011-07-22T10:23:42Z
dc.date.available2011-07-22T10:23:42Z
dc.description.abstractSome extensive researches have been undertaken on raw concrete, structural use of concrete and concrete production although a less concern has been given on the aspects of optimizing cost, quality and time (CTQ) objectives in concrete production. The degree of control over cost, quality and time overruns by client is limited to a certain extent during implementation stage of a project associated with more concrete based works due to various reasons. However, during the initial stage of a project (i.e. in initial procurement stage) the client has a sound control over cost and quality aspects of producing concrete. In this study the main objective was to develop a methodology to evaluate the performance of constructors in producing concrete introducing a scoring system in technical bid evaluation since concrete production is an essential and an expensive item in construction projects. First relationships of cost and quality parameters (Unit production cost-U, Wastage- Ws, Concrete strength-S, and Workability- W) were developed against the Rate of concrete production (R - Time parameter) using regression analysis using collected data from few national construction projects. Then a range of R was generated from 5 to 25 (m3/Hour) for different 81 constructors, fitting the best curves for above four relationships. The collected data were also analyzed statistically and descriptive statistic results were reviewed including mean, standard deviations, confidential intervals (Cl) at different confidence levels. Then the calculated S, W, U and Ws for above range of R were contrasted separately within their CI at 90%, 95%, 99%, 99.99% confidence levels for 81 constructors. The evaluating constructors for each parameter were done giving scores based on the CI within which the calculated parameter lays on for the range of R from 5 to 25 (m3/Hour). Finally total score obtained by each constructor (bidder) was determined and reviewed by adding individual scores of S, W, U and Ws with different weightings. The final out put was
dc.identifier.accno94522en_US
dc.identifier.citationPathirane, A.L. (2010). Evaluation performance of constructors in concrete producing based on cost and quality parameters [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/1891
dc.identifier.degreeMScen_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyEngineeringen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/1891
dc.language.isoenen_US
dc.subjectBUILDING ECONOMICS - Thesis
dc.subjectPROJECT MANAGEMENT - Thesis
dc.subjectCONCRETE CONSTRUCTION - Quality Control
dc.subjectCONCRETE CONSTRUCTION - Quality Control
dc.titleEvaluation performance of constructors in concrete producing based on cost and quality parameters
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
94522-1.pdf
Size:
552.6 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
94522-2.pdf
Size:
249.4 KB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
94522.pdf
Size:
21.78 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: