Risk Management Framework For Foreign Funded Water Projects Client’s Perspective

dc.contributor.advisorDe Silva N
dc.contributor.authorGamage, MGHD
dc.date.accept2016-02
dc.date.accessioned2017-03-19T06:49:47Z
dc.date.available2017-03-19T06:49:47Z
dc.description.abstractForeign funded projects operate under a special mechanism with the complex web of the different stakeholders. It faces different types of risk related to time and cost. Thus, it is important to control and manage the risk associated with foreign funded projects to ensure the achievement of project objectives on time. Therefore, this study focuses on risk analysis of water projects which a type of foreign funded projects in Sri Lanka. Accordingly, the aim of this study was to develop risk management framework for foreign funded water projects from client’s perspective. In total, 49 risk factors were identified through a detailed literature review. The factors were tabulated in a questionnaire form and sent out to gather owner’s perception on the rating of each risk factors regarding probability of occurrence and impact on foreign funded projects. A risk matrix having four risk levels as “low risk – (green)”, “moderate risk – (yellow)”, “high risk – (orange)” and “extreme high risk- (red)” is developed to evaluate significant risk factors. The analysis indicates that one factor is located in the green zone, twelve factors are located in the yellow zone, twenty two factors are located in the orange zone and thirteen factors are located in the red zone of the risk matrix. The predominant risk factors that are located in the red zone are considered for developing risk management framework. Risk response measures were identified through a literature review and respondent were asked to rank according to its effectiveness. Further effective risk response measures have also been proposed by the respondents for each of the identified risk factor. Based on the findings, a risk management framework was developed which will be benefit the risk management of foreign funded water projects.en_US
dc.identifier.accnoTH3215en_US
dc.identifier.citationGamage, M.G.H.D. (2016). Risk Management Framework For Foreign Funded Water Projects Client’s Perspective [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/12532
dc.identifier.degreeMaster of Science in Project Managementen_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/12532
dc.language.isoenen_US
dc.subjectforeign funded water projectsen_US
dc.subjectrisk
dc.subjectrisk identification
dc.subjectrisk matrix
dc.subjectrisk response measure.
dc.titleRisk Management Framework For Foreign Funded Water Projects Client’s Perspectiveen_US