Evaluation of application of lean principles to precast concrete bridge beam production process

dc.contributor.authorSenaratne, S
dc.contributor.authorEkanayake, S
dc.date.accessioned2023-02-17T09:40:43Z
dc.date.available2023-02-17T09:40:43Z
dc.date.issued2012
dc.description.abstractAlthough prefabrication is becoming popular as an approach to conquer the chronic problems in construction, it has inherent issues related to inefficiencies in its production process. To address these production process related inefficiencies, lean production principles (LPP) can be applied. Hence, this paper aims to investigate the application of LPP to the precast concrete bridge beam production process (PCBBPP). The research collected data within three selected case studies by observing PCBBPP and interviewing executive-level professionals, to map the process, to identify conversion activities and their efficiency enhancing methods, and to record flow activities and their associate waste, waste causes, and elimination/minimization methods. The research analysed data by using code-based content analysis, and the findings are presented by using tables, matrices, and maps. The results revealed 103 activities associated with PCBBPP, of which 59 are conversion activities. Among 44 flow activities, 17 can be eliminated. The results also indicated several methods and techniques to eliminate/ minimize flow activities and enhance the efficiency of PCBBPP conversion activities to enable implementation of LPP in prefabrication yards. By applying LPP to PCBBPP, several long-term benefits were revealed that contribute to sustainable construction. These results are useful for prefabrication companies and those who deal with sustainability issues. DOI: 10.1061/(ASCE)AE.1943-5568.0000063. © 2012 American Society of Civil Engineers.en_US
dc.identifier.citationSenaratne, S., & Ekanayake, S. (2012). Evaluation of Application of Lean Principles to Precast Concrete Bridge Beam Production Process. Journal of Architectural Engineering, 18(2), 94–106. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000063en_US
dc.identifier.databaseASCE Libraryen_US
dc.identifier.doihttps://doi.org/10.1061/(ASCE)AE.1943-5568.0000063en_US
dc.identifier.emailsepani@uom.lken_US
dc.identifier.issn1076-0431en_US
dc.identifier.issueJournal of Architectural Engineeringen_US
dc.identifier.journalJournal of Architectural Engineeringen_US
dc.identifier.pgnos94-106en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/20541
dc.identifier.volume18en_US
dc.identifier.year2012en_US
dc.language.isoenen_US
dc.publisherAmerican Society of Civil Engineersen_US
dc.subjectPrefabrication production processen_US
dc.subjectPrecast concrete bridge beam production processen_US
dc.subjectLean production principlesen_US
dc.subjectConversion activitiesen_US
dc.subjectFlow activitiesen_US
dc.titleEvaluation of application of lean principles to precast concrete bridge beam production processen_US
dc.typeArticle-Full-texten_US