Issues associated with Extension of Time (EOT) claim process in building projects in Sri Lanka

dc.contributor.advisorThayaparan, M
dc.contributor.authorMadushan, PSS
dc.date.accept2025
dc.date.accessioned2025-11-06T06:44:56Z
dc.date.issued2025
dc.description.abstractThis study investigates the key issues associated with EOT claims in Sri Lankan building construction projects, with a focus on identifying globally recognized issues and assessing their relevance to the local context. A mixed-method research approach was adopted, comprising a comprehensive literature review, a structured questionnaire survey distributed to 225 construction professionals (yielding 52 responses), and in- depth interviews with five industry experts. From the global literature, nineteen EOT-related issues were identified, of which documentation deficiencies, late submission of delay notices, disputes over delay causation, and inadequate demonstration of delay impacts emerged as the most critical within Sri Lanka. Expert insights further revealed systemic weaknesses in both claim preparation and evaluation, including lack of standardized methodologies, insufficient skilled evaluators, and inconsistent interpretation of contract provisions. To address these issues, the study recommends adopting standardized templates and delay analysis practices, strengthening contractual clarity, and enhancing stakeholder capacity through targeted training. The findings underscore the need for proactive measures to improve the fairness, efficiency, and credibility of EOT claim processes in Sri Lanka. This research contributes valuable insights for contractors, consultants, and policymakers seeking to mitigate disputes and enhance time management practices in the construction industry.
dc.identifier.accnoTH5890
dc.identifier.citationMadushan, P.S.S. (2025). Issues associated with Extension of Time (EOT) claim process in building projects in Sri Lanka [Master’s theses, University of Moratuwa]. , University of Moratuwa]. Institutional Repository University of Moratuwa. https://dl.lib.uom.lk/handle/123/24337
dc.identifier.degreeMaster of Science in Construction Law and Dispute Resolution
dc.identifier.departmentDepartment of Building Economics
dc.identifier.facultyArchitecture
dc.identifier.urihttps://dl.lib.uom.lk/handle/123/24337
dc.language.isoen_US
dc.subjectCONSTRUCTION INDUSTRY-Sri Lanka
dc.subjectBUILDING CONSTRUCTION-Extension of Time
dc.subjectBUILDING CONSTRUCTION-Delays
dc.subjectBUILDING CONSTRUCTION-Disputed Claims
dc.subjectCONSTRUCTION LAW AND DISPUTE RESOLUTION-Dissertation
dc.subjectBUILDING ECONOMICS-Dissertation
dc.subjectMSc in Construction Law and Dispute Resolution
dc.titleIssues associated with Extension of Time (EOT) claim process in building projects in Sri Lanka
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
TH5890-1.pdf
Size:
125.62 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
TH5890-2.pdf
Size:
217 KB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
TH5890.pdf
Size:
1.37 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: