Supervision of Fabrication of Precast Steel Fibre Reinforced Concrete (SFRC) Segmental Lining

dc.contributor.authorVarghees, G
dc.date.accessioned2015-08-24T11:55:00Z
dc.date.available2015-08-24T11:55:00Z
dc.date.issued2015-08-24
dc.description.abstractPrecast reinforced concrete (RC) segments have been widely used to construct tunnels for mass rapid transit lines in Singapore. However, the reinforcement bar cages are labour intensive to fabricate and install in moulds. Then the cages must be adjusted in moulds to achieve minimum cover at critical locations such as bolt sockets and cover to external face. Supervision has to be tight to achieve good quality segments. However, with the use of steel fibre reinforced concrete (SFRC), steel reinforcement bars have been eliminated. Steel fibres are added during the batching of concrete. Concrete is then poured in moulds and compacted. Compaction is done by using external vibrators mounted on moulds. For downtown line stage 3 contract 933, SFRC segments were used as tunnel lining. C@nspecs Pte Ltd supervised the production of SFRC segments in the factory. This paper outlines the quality control tests done on the fresh and hardened concrete.en_US
dc.description.sponsorshipInternational Council for Research and Innovation in Building and Construction (CIB)en_US
dc.identifier.conferenceThe 4th World Construction Symposium 2015en_US
dc.identifier.departmentDepartment of Building Economics, University of Moratuwa, Sri Lankaen_US
dc.identifier.facultyITen_US
dc.identifier.pgnosp 469-474en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingSustainable Development in the Built Environment: Green Growth and Innovative Directionsen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/11259
dc.identifier.year2015en_US
dc.language.isoenen_US
dc.subjectPrecast Reinforced Concrete; Steel Fibre Reinforced Concrete (SFRC)en_US
dc.titleSupervision of Fabrication of Precast Steel Fibre Reinforced Concrete (SFRC) Segmental Liningen_US
dc.typeConference-Full-texten_US

Files