Factors affecting construction costs in Sri Lanka

dc.contributor.authorHiroshan, SAC
dc.contributor.authorHadiwattege, C
dc.contributor.editorSandanayake, YG
dc.contributor.editorKarunasena, NG
dc.contributor.editorKarunasena, GI
dc.date.accessioned2022-02-23T08:00:14Z
dc.date.available2022-02-23T08:00:14Z
dc.date.issued2014-06
dc.description.abstractThis study identifies severe cost factors that define the construction project cost in order to reduce costs and cost overruns in public sector building projects. A comprehensive literature survey was followed by two rounds of Delphi surveys to extract a set of exclusive cost factors and their levels of importance with the participation of a panel of 30 experts. Severity index (to rank the cost factors according to the importance), correlation analysis (to check the agreement between the parties), cross tabulation (to identify the linear relationships between the collected data) and hypothesis testing (to prove the agreements between the parties and to check the confident levels) were used to analyse the data. According to the research study findings, 44 cost defining factors were identified for the public sector building projects. Further, the differences in perspectives upon significance of cost factors by the direct stakeholders of construction industry were also identified. Most significant cost factors were identified as; cost of materials, size of the projects, projects planning and the complexity of projects. Further, factors were categorised in to the five main categories. Construction parties’ related factors contributed to the construction costs by 25%. Financial factors contributed to the costs by 21%. Construction item related factors contributed to the costs by 20%. Environmental factors contributed to the 18% while political factors affecting to construction costs by 19%. Most significant cost factors of each category were identified separately and a guideline was formed to help minimize building construction cost in Sri Lanka leading to a better sustainable construction practice.en_US
dc.description.sponsorshipCeylon Institute of Builders (CIOB)en_US
dc.identifier.citationHiroshan, S.A.C., & Hadiwattege, C. (2014). In Y.G. Sandanayake, N.G. Fernando & G.I. Karunasena (Eds.), Sustainability and development in built environment: the way forward (pp. 238-248). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2014-Proceedings.pdfen_US
dc.identifier.conference3rd World Construction Symposium 2014en_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.emailchandanieh@uom.lken_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 238-248en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingSustainability and development in built environment: the way forwarden_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17050
dc.identifier.year2014en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Buildersen_US
dc.relation.urihttps://ciobwcs.com/downloads/WCS2014-Proceedings.pdfen_US
dc.subjectBuilding projectsen_US
dc.subjectDirect stakeholdersen_US
dc.subjectPublic sectoren_US
dc.titleFactors affecting construction costs in Sri Lankaen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
FACTORS AFFECTING CONSTRUCTION COSTS IN SRI LANKA.pdf
Size:
586.02 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections