dc.description.abstractPurpose – The purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems. Design/methodology/approach – An abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index. Findings – The critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Managementoriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context. Research limitations/implications – The study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka. Practical implications – The systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement. Originality/value – A study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.en_US
dc.identifier.citationPerera, G., Tennakoon, M., Kulatunga, U., Jayasena, H., & Wijewickrama, M. K. C. (2020). Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11, 611–626. https://doi.org/10.1108/BEPAM-03-2020-0056en_US
dc.identifier.databaseEmeralden_US
dc.identifier.doihttps://doi.org/10.1108/BEPAM-03-2020-0056en_US
dc.identifier.issn2044-124Xen_US
dc.identifier.issue4en_US
dc.identifier.journalBuilt Environment Project and Asset Managementen_US
dc.identifier.pgnos611–626en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/21044
dc.identifier.volume11en_US
dc.identifier.year2021en_US
dc.language.isoenen_US
dc.publisherEmerald Group Publishing Limiteden_US
dc.subjectProcurementen_US
dc.subjectSelection criteriaen_US
dc.subjectSteel building constructionen_US
dc.titleSelecting suitable procurement system for steel building constructionen_US
dc.typeArticle-Full-texten_US

Files