Accurate estimating on labour productivity in Sri Lankan construction industry

dc.contributor.advisorRameezdeen R
dc.contributor.authorAmarasekera, EALSB
dc.date.accept2010
dc.date.accessioned2011-07-22T10:42:13Z
dc.date.available2011-07-22T10:42:13Z
dc.description.abstractSri Lankan Construction Industry is greatly concerned about Labour Productivity. Estimating labour accurately has become predominantly a difficult task in the industry. Literature survey was conducted to ascertain indices developed by other countries to measure labour productivity, Factors affecting labour productivity etc.. Case Study research was carried out in Three buildings types Namely High Rise, Medium Rise and Low Rise categories in relation to Cement Block Work, Plastering and Tiling trades. Hrs per Unit Measurements together with Novel Tool Time Analysis Techniques were used in conducting case studies. All parameters pertaining to the labour study were kept equal in all three building types during the case study research, but the study carried our in open environment where no controls have been introduced. Research suggests that single labour rate is not meaningful for every eventuality in construction. It was found that the Best Tool time in other words Best Productivity exists in Medium Rise Buildings, and the Least Productivity recorded in High Rise Building projects. Average Productivity was evident in Low Rise Buildings. Keywords: Labour Productivity, Tool l'I'ime, Construction Industry
dc.identifier.accno94528en_US
dc.identifier.citationAmarasekera, E.A.L.S.B. (2010). Accurate estimating on labour productivity in Sri Lankan construction industry [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/1897
dc.identifier.degreeMScen_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/1897
dc.language.isoenen_US
dc.subjectBUILDING ECONOMICS - Thesis
dc.subjectPROJECT MANAGEMENT - Thesis
dc.subjectCONSTRUCTION INDUSTRY - Labour
dc.subjectLABOUR PRODUCTIVITY
dc.subjectCONSTRUCTION INDUSTRY - Tool / Time
dc.titleAccurate estimating on labour productivity in Sri Lankan construction industry
dc.typeThesis-Abstract

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
94528-1.pdf
Size:
415.44 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
94528-2.pdf
Size:
19.15 MB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
94528.pdf
Size:
19.17 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: