Sustainable biomass production for energy in Sri Lanka

dc.contributor.authorPerera, KKCK
dc.contributor.authorRathnasiri, PG
dc.contributor.authorSugathapala, AGT
dc.date.accessioned2023-02-17T09:26:21Z
dc.date.available2023-02-17T09:26:21Z
dc.date.issued2003
dc.description.abstractThe present study concentrates mainly on the estimation of land availability for biomass production and the estimation of sustainable biomass production potential for energy. The feasible surplus land area available for bioenergy plantation is estimated assuming two land availability scenarios (Scenarios 1 and 2) and three biomass demand scenarios (IBD Scenario, SBD Scenario and FBD Scenario). Scenario 1 assumes that 100% of the surplus area available in base year 1997 will be suitable for plantation without considering population growth and food production and that 75% of this surplus land is feasible for plantation. Scenario 2 assumes that future food requirement will grow by 20% and the potential surplus area will be reduced by that amount. The incremental biomass demand scenario (IBD Scenario) assumes that only the incremental demand for biomass in the year 2010 with respect to the base year 1997 has to be produced from new plantation. The sustainable biomass demand scenario (SBD Scenario) assumes that the total sustainable supply of biomass in 1997 is deducted from the future biomass demand in 2010 and only the balance is to be met by new plantation. The full biomass demand scenario (FBD Scenario) assumes that the entire projected biomass demand of the year 2010 needs to be produced from new plantation. The total feasible land area for the scenarios IBD-1, 1BD-2, SBD-1, SBD-2, FBD-1 and FBD-2 are approximately 0.96, 0.66, 0.80, 0.94, 0.60 and , respectively. Biomass production potential is estimated by selecting appropriate plant species, plantation spacing and productivity level. The results show that the total annual biomass production in the country could vary from 2 to . With the production option (i.e. spacing plantation with fertilizer application) giving the highest yield, the total biomass production for energy under IBD Scenario would be for Scenario 1 and for Scenario 2. Under SBD Scenario, the corresponding values are for Scenario 1 and for scenario 2. Finally, FBD Scenario leads to a total biomass production of for Scenario 1 and for Scenario 2. The total investment for bioenergy plantation is estimated, and the barriers and policy options for biomass production for energy are also presented in this study.en_US
dc.identifier.citationPerera, K. K. C. K., Rathnasiri, P. G., & Sugathapala, A. G. T. (2003). Sustainable biomass production for energy in Sri Lanka. Biomass and Bioenergy, 25(5), 541–556. https://doi.org/10.1016/S0961-9534(03)00090-4en_US
dc.identifier.databaseScienceDirecten_US
dc.identifier.doi10.1016/S0961-9534(03)00090-4en_US
dc.identifier.issn0961-9534en_US
dc.identifier.issue5en_US
dc.identifier.journalBiomass and Bioenergyen_US
dc.identifier.pgnos541-556en_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/20539
dc.identifier.volume25en_US
dc.identifier.year2003en_US
dc.language.isoen_USen_US
dc.publisherElsevieren_US
dc.subjectBiomass productionen_US
dc.subjectLand useen_US
dc.subjectEnergy demanden_US
dc.subjectBioenergyen_US
dc.subjectFuelwooden_US
dc.subjectAfforestationen_US
dc.subjectEnergy supplyen_US
dc.titleSustainable biomass production for energy in Sri Lankaen_US
dc.typeArticle-Full-texten_US

Files