Exploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lanka

dc.contributor.advisorde Silva L
dc.contributor.authorTharanga KC
dc.date.accept2019
dc.date.accessioned2019
dc.date.available2019
dc.date.issued2019
dc.description.abstractThe aim of this research is explore the barriers in implementation of Total Quality Management System in flyover construction projects in Sri Lanka. The research model was developed with the help of previous studies to get a guide. Identification of different factors that affect for the implementation of TQM in the construction project were identified with the guide of previous studies and the general discussion had with the experts in the industry. A comprehensive literature was conducted to acquire knowledge on quality, to understand the quality systems used in the construction sector and to identify different factors/barriers that affect for the quality management and implementation of TQM. To understand barriers in implementation of TQM, data was collected from employees such as project managers, engineers, surveyors and quantity surveyors who have been participated in flyover projects in Sri Lanka. The data was collected using quantitative survey and using questionnaires that were distributed by hand or through e mail. The collected data was analyzed by using SPSS for measure the internal consistency (reliability) of the data set collected from the questionnaire survey and it gave grater internal consistency. Descriptive statistics and mean score method have been used to identify critical barriers against the TQM implementation. Based on results, 5 numbers of barriers were identified as low impacted barriers (Green zone), 13 numbers of barriers were identified as moderate impacted barriers (Yellow zone) and 7 numbers of barriers were identified as extreme impacted barriers (Red zone). The framework was developed with control measures against the extreme barriers identified in the study. In the recommendation, Trainings, team work concept, effective communication, continuous improvement, employee empowerment and employee awareness on TQM benefits are identified as major control measures.en_US
dc.identifier.accnoTH4051en_US
dc.identifier.citationTharanga, K.C. (2019). Exploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lanka [ Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/15866
dc.identifier.degreeMSc in Project Managamenten_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/15866
dc.language.isoenen_US
dc.subjectBUILDING ECONOMICS-Dissertationsen_US
dc.subjectPROJECT MANAGEMENT-Dissertationsen_US
dc.subjectBRIDGES, HIGHWAY-Flyoversen_US
dc.subjectHOGHWAY SYSTEMSen_US
dc.subjectTOTAL QUALITY MANAGEMENTen_US
dc.subjectCONSTRUCTION INDUSTRY-Quality Controlen_US
dc.titleExploring the barriers in implementation of total quality management system in flyover construction projects in Sri Lankaen_US
dc.typeThesis-Full-texten_US

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
TH4051-1.pdf
Size:
298.77 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
TH4051.pdf
Size:
2.31 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis
Loading...
Thumbnail Image
Name:
TH4051-2.pdf
Size:
382.77 KB
Format:
Adobe Portable Document Format
Description:
Post-text