Clients delay in infrastructure projects : a case of road development authority (RDA)

dc.contributor.advisorDe Silva, EN
dc.contributor.authorFernando, HSRD
dc.date.accept2013
dc.date.accessioned2014-12-12T17:05:21Z
dc.date.available2014-12-12T17:05:21Z
dc.date.issued2014-12-12
dc.description.abstractThe client delay in construction of infrastructure projects is a very common issue in Road Development Authority (RDA) in Sri Lanka. For client delays, the contractor is entitled for extension of time (EOT) beyond the intended completion date of the project which results price escalation of materials and resources and claims for idling of resources / overheads to the contractor. This study was carried out to analyze client delays in RDA road, bridge and drain projects. First, 80 number of client delay factors were summarized from widespread literature review and the amount of delay of each of these factors in 28 RDA projects were recorded by extension of time (EOT) reports. Then the risk index (RI) was analyzed to identify the significant client delay factors and Time Performance Index (TPI) was statically analyzed using SPSS 16.0 version to quantify the amount of significant client delay in RDA projects. It was found that, the ratio of actual contract duration to planned contract duration with respect to the client delay is more than 210% at 95% significance level. Further, there are 20 significant client delay factors in RDA projects. The top 10 client delay factors are very significant and represent 95% of the total client delay. Eight factors of these 10 very significant factors are human related factors that can be reduced and controlled by proper planning and designing of projects. The top five client delay factors are Variation order, Land acquisition, Inclement weather, Payment delay and Shifting of existing services.en_US
dc.identifier.accno105064en_US
dc.identifier.citationFernando, H.S.R.D. (2013). Clients delay in infrastructure projects : a case of road development authority (RDA) [Master's theses, University of Moratuwa]. Institutional Repository University of Moratuwa. http://dl.lib.mrt.ac.lk/handle/123/10616
dc.identifier.degreeM.Sc.en_US
dc.identifier.departmentDept.of Building Economicsen_US
dc.identifier.facultyArchitectureen_US
dc.identifier.urihttp://dl.lib.mrt.ac.lk/handle/123/10616
dc.language.isoenen_US
dc.subjectBUILDING ECONOMICS-DISSERTATIONen_US
dc.subjectPROJECT MANAGEMENT-DISSERTATION
dc.subjectROAD DEVELOPMENT AUTHORITY
dc.subjectRDA-Sri Lanka
dc.subjectInfrastructure Projects
dc.subjectClient Delay
dc.titleClients delay in infrastructure projects : a case of road development authority (RDA)en_US
dc.typeThesis-Abstracten_US

Files

Original bundle

Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
105064-1.pdf
Size:
455.87 KB
Format:
Adobe Portable Document Format
Description:
Pre-text
Loading...
Thumbnail Image
Name:
105064-2.pdf
Size:
333.09 KB
Format:
Adobe Portable Document Format
Description:
Post-text
Loading...
Thumbnail Image
Name:
105064.pdf
Size:
14.13 MB
Format:
Adobe Portable Document Format
Description:
Full-thesis