The need for an integrated cost modelling framework for building information modelling

dc.contributor.authorDe silva, R
dc.contributor.authorJayasena, HS
dc.contributor.editorSandanayake, YG
dc.contributor.editorFernando, NG
dc.date.accessioned2022-03-29T08:11:19Z
dc.date.available2022-03-29T08:11:19Z
dc.date.issued2013-06
dc.description.abstractBuilding Information Modelling (BIM), a revolutionary concept in the construction industry, produces an object-oriented, intelligent and parametric digital representation of the construction facility, which requires a collaborative participation of members of the design team members. These emphasize that BIM has characteristics of sustainable procurement strategies. Open BIM standards developed by buildingSMART International, are the most popular data standards for BIM to share digital construction information within the design team and beyond throughout the life cycle of the project. Other proprietary BIM standards are also extensively used, but they often have limitations on sharing information across all stakeholders. Even though BIM conceptually is an integrated approach for all project team members, not all functions are performed within the common platform. Project participants use their domain specific tools often with proprietary standards, and share the results translated to common standards. BIM enables a live information model with which all project participants can actively interact. This enables minimizing of errors and early clash detection, paving the way to sustainable project delivery methods. However, Quantity Surveying functions within a BIM based project delivery was found to be least interactive. This has hindered the real benefits receivable from a BIM implementation. Since, a cost model will provide critical information required for decision making at various stages, an up-to-date cost model is critical for a BIM based project delivery. While a variety of software tools is used for this purpose, a standardized method is not found to share cost information effectively with BIM. This study aims to develop a suitable framework for cost modelling for a BIM implementation in order to help develop BIM standards for cost modelling. This paper contains the preliminary findings of an ongoing research.en_US
dc.identifier.citationDe Silva, R. & Jayasena, H.S. (2013). The need for an integrated cost modelling framework for building information modelling . In Y.G. Sandanayake & N.G. Fernando (Eds.), Socio-economic sustainability in construction: practice, policy and research (pp. 427-434). Ceylon Institute of Builders. https://ciobwcs.com/downloads/WCS2013-Proceedings.pdfen_US
dc.identifier.conference2nd World Construction Symposiumen_US
dc.identifier.departmentDepartment of Building Economicsen_US
dc.identifier.emailramadha.desilva@gmail.comen_US
dc.identifier.emailsuranga@uom.lken_US
dc.identifier.facultyArchitectureen_US
dc.identifier.pgnospp. 427-434en_US
dc.identifier.placeColomboen_US
dc.identifier.proceedingSocio-economic sustainability in construction: practice, policy and researchen_US
dc.identifier.urihttp://dl.lib.uom.lk/handle/123/17495
dc.identifier.year2013en_US
dc.language.isoenen_US
dc.publisherCeylon Institute of Buildersen_US
dc.relation.urihttps://ciobwcs.com/downloads/WCS2013-Proceedings.pdfen_US
dc.subjectBuilding information modellingen_US
dc.subjectCost modellingen_US
dc.subjectOpen BIM standarden_US
dc.subjectQuantity surveyingen_US
dc.titleThe need for an integrated cost modelling framework for building information modellingen_US
dc.typeConference-Full-texten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
the need for an integrated cost.pdf
Size:
285.06 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections